Title Page
-
Site conducted
EDI Weekly Site Inspection
-
Conducted on
-
Site Supervisor
-
Inspection conducted by
-
Number of employees on site
Site Office Administration:
-
Project requires SSP?
-
SSP complete, reviewed with supervisor, and saved in FieldFlo
-
All controls in SSP in place
-
Failure to implement general administrative tools
- FieldFlo docs not open before 9 am (Sign-in, PJS/JHA, Daily log)
- Designated provider letter not printed and/or available
- Emergency contact information not visibly posted
- Scope/drawings not readily available to supervisor
- Manifests not available for dumpsters on-site
- FD/PD notification not available in FieldFlo docs
- NO- All general administrative requirements are in compliance
-
SDS for chemicals on site readily available to supervisor
-
Are all storage containers clearly marked in compliance with the HazCom standard?
-
Permits, notifications, and mods current and complete?
-
What must be done? (select one or more)
- Supervisor mod
- Start/end date mod
- Obtain/post original permit
- Obtain/post phase permit
- Other
-
Specify
-
All required employee records current and available to supervisor?
-
Missing tools from the supervisors phone?
- Noise meter
- FieldFlo
- Company email
- NONE: Device has all required tools
-
Weekly air monitoring results visibly posted
-
Additional administrative observations?
-
Explain
FieldFlo
-
JHA complete and verified by all employees on site
-
Does JHA include all present tasks and hazards with appropriate controls?
-
Are all controls listed in JHA being implemented?
-
All workers have required training listed in FieldFlo
Employee involvement
-
Name(s) of worker(s) interviewed
Interview items
-
Did worker participate in morning toolbox talk?
-
Does worker's description of safety meeting match meeting log on daily field report?
-
Does worker know and understand JHA process and content?
-
Does worker understand incident reporting procedures?
-
What is the most effective feature of our safety program?
-
What do you think we can improve regarding worker safety?
-
Additional observations regarding employee involvement?
-
Explain
Health and hygiene
-
Is there at least 1 bathroom for every 10 workers?
-
Are facilities available for washing hands and personal protective equipment?
-
Hazardous materials WIP
- Asbestos
- Lead
- Mold
- Environmental/Other
- No health exposures
-
Describe other environmental or health hazards
-
Has a regulated area been established with appropriate signage?
-
Are appropriate controls in place? (e.g. NAM's, material wetting, etc.)
-
Has appropriate PPE been selected and in use?
-
Are all relevant IH reports/documents available to supervisor for review?
-
Has a regulated area been established with appropriate signage?
-
Personal monitoring being conducted?
-
Are appropriate controls in place? (e.g. NAM's, material wetting, etc.)
-
Has appropriate PPE been selected and in use?
-
Are all relevant IH reports/documents available to supervisor for review?
-
TCLP all waste and dispose of properly?
-
Regulated work area and signage in place?
-
PPE/Respirator selection sufficient to protect workers from exposure?
-
Personal monitoring being conducted?
-
Material being removed is adequately wet?
-
Amended water in use?
-
Visible emissions from work area?
-
Project manager required?
-
PM present or PM waiver aproved? (<1,000 lin. or 3,000 sq.)
-
Material content
-
Is waste material properly packaged and labeled for disposal?
-
Manifest on-hand for materials to be disposed?
-
Control level
- Minimal quantity, hand removal, component removal methods
- Secondary, mini-containment, glove-bag, other non-full containment
- Full containment
-
Pre-cleaning conducted prior to setup/removal?
-
Decontamination unit setup and operational?
-
Critical barriers installed?
-
Glove-bag/containment installation meets minimal standard?
-
Smoke tubes attached to containment entrance?
-
Negative air machines in place and operating?
-
Sufficient Negative pressure established?
-
HEPA filters in working condition?
-
Exhaust to exterior or monitored by AMS?
-
All access to containment separated with z flaps?
-
Viewport in place?
-
Load-out, shower, and clean room clear of visible debris?
-
Materials remain non-friable for duration of work?
-
-
Original permit posted visibly on-site
-
Project design signed and posted on-site?
-
Containment log at decon entrance/exit?
-
Pre-cleaning conducted prior to setup/removal?
-
Decontamination unit and load-out setup and operational?
-
Containment installation meets standard requirements? (critical barriers, 2 layers on floor/walls, fixed items covered, no seems on corners, 12 inch overlap, etc.)
-
3 chamber decon and 2 chamber load-out separated with z flaps?
-
Smoke tubes attached to containment entrance?
-
12x12 View-port in place?
-
Negative air machines in place and operating?
-
Negative pressure >-0.02 established and monitored with monometer?
-
Exhaust to exterior or monitored by AMS?
-
HEPA filters in working condition?
-
Airless sprayer present and in use?
-
Load-out, shower, and clean room clear of visible debris?
-
Material removed with hand methods only?
-
Material remains non-friable for duration of work?
-
Component removal: material adequately adhered to surface and/or wrapped in 2 layers of 6 mil. poly?
-
Has a regulated area been established with appropriate signage?
-
Personal monitoring being conducted?
-
Are appropriate controls in place? (e.g. NAM's, material wetting, etc.)
-
Has appropriate PPE been selected and in use?
-
Are all relevant IH reports/documents available to supervisor for review?
Work site administration
-
All required work area signage in place(caution, overhead, danger tape, etc.)
-
Is the site secure from non-authorized personnel and proper signage in place?
-
Are all working materials and equipment stored in a safe and secure location?
-
Are workers provided with a safe and secure place for storing personal items?
-
Additional worksite administration observations?
-
Explain:
Management systems
-
Supervisor understands incident response and reporting procedures
-
Has supervisor report of injury form been filled out for all incidents?
-
Has the designated provider letter been signed by any person sent to the clinic for treatment and saved to project documents vault?
-
Management ratio < 5:1
-
What safety programs are applicable to this job?
- Aerial lifts
- Confined space
- Electrical safety
- Fall protection
- Fire protection
- Fork lift/industrial truck
- Hearing and noise expossure
- Ladder safety
- Lockout/Tag-out
- Respiratory protection
- Rigging and material handling
- Scaffold safety
- Trenching and excavations
- Welding/cutting/hotwork
- Other:
-
What other applicable safety programs:
-
Are there significant budget or schedule pressures on this job?
-
Please explain:
-
Additional observations regarding management systems?
-
Explain
Work environment
-
Are all walkways and work areas clear, illuminated, and adequately marked?
-
Are all work materials and/or waste materials stored in a safe location and well organized?
Equipment
-
Are all tools and equipment in use in safe working condition, and all damaged/defective equipment red-tagged and removed from service?
-
Additional observations regarding equipment?
-
Explain
Work operations
-
Did any workers engage in any unsafe acts?
-
Please explain:
-
Were there any unsafe working conditions?
-
Please explain:
-
Any PPE issues? (wrong selection, wrong size, defective item in use, etc.)
-
Please explain:
-
Additional observations regarding work operations?
-
Explain
-
Is it apparent that a clear work plan is being executed?
General safety
-
What is the most LIKELY hazard on this site?
-
What is the most SEVERE hazard on this site?
Confirmation
-
Auditor - By signing I attest that to the best of my knowledge the information contained in this inspection report is current and correct, and I have reviewed this material with the site supervisor. I also confirm that I have/will fulfill my responsibility to work with the site supervisor and ensure prescribed corrections are implemented.
-
Supervisor - By signing I attest that I understand the information contained in this inspection report, and I have reviewed this material with the site auditor. I also confirm that I have/will fulfill my responsibility to implement the prescribed corrective actions contained in this report.