EDWARDS PEARSON GUILLOTINE PRE OPERATIONAL CHECK SHEET

  • EDWARDS PEARSON GUILLOTINE PRE OPERATIONAL CHECK SHEET

  • Conducted on

INSPECTED BY

  • undefined

  • By

  • Photo required.

Safety devices.

  • Check electrical interlock switches are securely attached and alligned

  • Check interlock Guards function correctly

  • Check the gate catches lock out the gate

  • Check fitting security,operation and adjustment,including the safety features ,guards and indication light by the safety switch

  • Is the emergency stop facility effective

  • Power up and and check the operational controls .Operate each function and reset

Mechanical.

  • Check machine anchor bolts.

  • Check for oil leaks / repair as required.

  • Check for oil levels, top up as required.

  • Check for damage to beam and tooling clamps.

  • Check shadow line.

  • Check couplings for wear / Damage.

  • Check condition of tooling.

Control panel and electrics.

  • Check control panel for damage.

  • Isolate power

  • Check condition of cables to all drive motors.

  • Check condition of limit switches

Final operation check.

  • is the area well illuminated

  • Check all operations.<br><br><br>

INSPECTOR

  • Add signature

  • SHEQ

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.