Audit details
-
Site Name
-
Reference:
-
Conducted on
-
Prepared by
-
Location
-
Personnel on site
General EHS
CDM Notifications
-
Is the work considered to be covered under the CDM regulations 2015
-
Is It Notifiable to the HSE : Current and Valid F10
-
Evidence
-
Action to rectify invalid F10
-
Principal Contractor
-
Principal Designer
-
Client
-
Designer
-
CDM Guidance
http://www.citb.co.uk/health-safety-and-other-topics/health-safety/construction-design-and-management-regulations/cdm-guidance-documents/ -
Add Contractor
Contractor
-
Company
-
Personnel
-
Notes
Site notices and logs
-
Safety and hazard warning signs present?
-
First Aid poster present?
-
Contractors log and visitors book?
-
Near miss procedures in place?
-
Have there been any near misses.
Add near miss
-
Health and Safety Law poster as required under the Health and safety at work regulations?
-
Notes
-
Score
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
Welfare provisions
-
HSE welfare guidance
http://www.hse.gov.uk/construction/safetytopics/welfare.htm -
Are toilet facilities available?
-
Are hand washing facilities available?
-
Is drinking water available?
-
Is there suitable First aid equipment?
-
Are there drying facilities?
-
Are the cooking and rest facilities?
-
Notes
-
Score
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
Utility services (underground and overhead)
-
Overhead
-
Is a suitable services layout available for both private and utility owned?
-
Is work near the services being carried out in accordance with HSE guidance GS6?
-
GS6
http://www.hse.gov.uk/pubns/gs6.htm -
Underground
-
Is a suitable services layout available for both private and utility owned?
-
Is work near the services being carried out in accordance with HSE guidance HSG47?
-
HSG47
http://www.hse.gov.uk/pubns/books/hsg47.htm -
Should work stop?
-
Notes
-
Score
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
Toolbox talks
-
Have tool box talks been undertaken and adequately recorded?
-
Notes
-
Score
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
Functional Isolation Procedures
-
Are functional isolation procedures in place and documented?
-
Notes
-
Score
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
Notifications
-
Has the Site Responsible Officer been made aware of the work?
-
Have all alarms been appropriately silence?
-
Are there appropriate handover procedures in place?
-
Notes
-
Score
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
Operational H&S
1. Risk assessment
-
1.1 Available and Current?
-
1.2 All risks covered adequately?
-
1.3 Have any dynamic risk assessments been made and have they been recorded?
-
Should the work stop?
-
Notes
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
2. Method Statement
-
2.1 Available and current?
-
2.2 Method is adequately detailed?
-
2.3 Signed and dated as required?
-
2.4 Lone working procedures being followed?
-
2.5 Has the method of work changed and has this been recorded?
-
Should the work stop?
-
Notes
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
Asbestos Register
-
Is an asbestos register available?
-
Is asbestos identified and mark on site?
-
Is the work affecting the asbestos
-
Should the work stop?
-
Notes
3. Lifting Operations
-
Are lifting operations taking place?
-
3.1 Lift plan complete and as required?
-
3.1.1 Sketch lift plan:
-
3.2 Appointed person present?
-
3.3 Adequate and relevant communication?
-
3.4 Correct documentation (tags and certificates) ?
-
Should the work stop?
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
-
Notes
4. Confined spaces
-
Are there any confined space entry works being undertaken?
-
4.1 Categorisation complete and available?
-
4.2 Appropriate level of PPE and other equipment??
-
4.3 Access and egress procedures in place?
-
4.4 Emergency procedures and rescue plans including appropriate rescue equipment?
-
4.5 Authorised person identified and present?
-
Should the work stop?
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
-
Notes
5. Excavation
-
Are there any excavations on site?
-
5.1 Underground services identified, located and recorded?
-
5.1.1 Sketch details if appropriate
-
5.2 Suitable access?
-
5.3 Edge protection required?
-
5.4 Collapse protection required?
-
5.5 Flood control equipment managed?
-
Should the work stop?
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
-
Notes
6. Diving
-
Are Diving activities taking place
-
6.1 Dive Safe Plan completed and current?
-
6.2 Authorised person identified and present?
-
6.3 Access and Egress into water acceptable?
-
6.4 Emergency and rescue procedures in place?
-
Should the work stop?
-
Notes
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
7. Work Near Water
-
Are activities taking place near water or where there is a foreseeable risk of drowning?
-
7.1 Adequate prevention of falls into fast flowing or deep water?<br>
-
7.2 Are water levels safe and monitored?
-
7.3 Are rescue procedures in place?
-
7.4 Appropriate PPE worn and checked?
-
Should the work stop?
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
-
Notes
8. Working at Height
-
Are Working at height activities taking place?
-
8.1 Are operatives competent for assembling, operating and using access equipment? (e.g. IPAF)
-
8.2 Visual check on scaffolding and towers completed?
-
8.2.1 Take photographs of scaffolding:
-
8.3 Have fragile structures been identified and protect against?
-
8.4 Is edge protection completed and adequate?
-
8.5 Are ladders suitable for their intended use and properly inspected?
-
Should the work stop?
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
-
Notes
9. Hot Work
-
Are hot work activities taking place?
-
9.1 Permits in place and conformed to?
-
9.2 Emergency fire procedures in place?
-
9.3 Spread prevention measures in place and combustible materials protected?
-
Should the work stop?
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
-
Notes
9. Electrical and Mechanical Safety
-
9.1 Are persons working on electrical equipment authorised to do so?
-
9.2 Are electrical Isolation procedures in place?
-
9.3 Are appropriate locks and labels in use?
-
9.4 Are persons working on mechanical equipment authorised to do so?
-
9.5 Are mechanical Isolation procedures in place?
-
9.6 Are appropriate locks and labels in use?
-
Should the work stop?
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
-
Notes
10.Occupational Health
-
Are there any activities taking place that may affect occupational health?
-
10.1 Noise protection procedures in place?
-
10.2 Body vibration procedures in place?
-
10.3 Manual handling procedures assessed and controlled
-
10.4 Do all operatives have adequate PPE and access to PPE?
-
10.5 Is fatigue control in place?
-
10.6 Is there an awareness of Leptospirosis
-
10.7 Is the appropriate level of PPE in place for the activities being undertaken.
-
Should the work stop?
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
-
Notes
11 Contractor Personnel
-
11.1 CSCS cards carried by all personnel?
-
11.2 Plant competency cards (CPCS) carried by appropriate personnel?
-
11.3 Personnel first aid trained?
-
11.4 Are operatives trained, competent and knowledgable?
-
Should the work stop?
-
Notes
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
12 Sub-Contractor Personnel
-
Are Sub Contractors working on site?
-
12.1 CSCS cards carried by appropriate personnel?
-
12.2 Plant competency cards (CPCS) carried by appropriate personnel?
-
12.3 Personnel first aid trained?
-
12.4 Are operatives trained, competent and knowledgable?
-
12.5 Are sub contractors being correctly monitored and managed?
-
Should the work stop?
-
Notes
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
13. Control of Substances Hazardous to Health COSHH.
-
13.2 Emergency procedures in place?
-
13.1 Are COSHH details available for any hazardous substances in use?
-
13.3 Has a COSHH risk assessment been completed and is it on site?
-
Should the work stop?
-
Notes
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
Site EHS
Site EHS
-
Is there an adequate traffic management plan, is it being adhered to?
-
Is plant operating near overhead services are adequate measures in place in accordance with HSE GS6?
-
Is the access and egress at the site acceptable?
-
Is storage suitable and safe for the materials being used?
-
Security fencing in place and adequate?
-
Footpaths and boundaries identified and marked?
-
Appropriate signage where required (high voltage, deep water etc)?
-
Loading and unloading procedures in place and adhered to?
-
Public protection measures in place?
-
Waste and recycling controls being adhered to?
-
Are there any Invasive or non native species or plants.
-
Add media
-
Are fuels being store safety and correctly in accordance with Pollution Prevention Guidlines?
-
Should the work stop?
-
Scoring
- 0
- 2
- 4
- 6
- 8
- 10
- N/A
-
Notes
Sign off
-
By signing below, I am certifying that the information recorded is true to the best of my knowledge, and that I have followed all guidance and best practice as instructed.
This audit will form part of supplier assessment and performance measures. -
Auditor
-
Site Representative
-
Is the work considered safe to continue
-
Has an instruction to stop all works been given?
-
Should the contractor receive a yellow or red warning card
-
Notes