Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

EHS Program

  • Required training completed

  • Risk Assessment Completed/FLRA Completed/Reviewed

  • Other

PPE

  • Eye Protection (sealed, close-fitting, face shield)

  • Foot Protection (met guards)

  • Hearing Protection (plugs, muff, both)

  • Hand Protection (proper glove for the task)

  • Respiratory Protection (1/2, full, supplied)

  • Fall Protection (harness, SRL, lanyard, 100% tie-off

  • Other

General Facility/Site Conditions/Housekeeping

  • Surface / Floor / Wall / Ceilings

  • Exits / Egress Routes Clear / Signage Posted

  • Stairways / Walkways / Ramps / Platforms

  • Driveways / Aisles

  • Warning Signs / Markings / Postings

  • General and Emergency Lighting

  • Other

Orderliness & Material / Chemical Storage

  • Stacking And Storage

  • Organized / Not Congested / Stable

  • Containers Provided For Debris

  • Spill Containment and Response / Proper Resources

  • Proper Container in Use - Labelled

  • MSDS Available and Reviewed

  • Other

Fire Protection

  • Fire Extinguishers Provided & Inspected

  • No Smoking - Flammable - Combustible Signs

  • Flammable / Combust Liquid / Material Storage

  • Welding & Cutting (Flash Arrestors)

  • Oxy - Fuel Cylinders Stored 25' Apart

  • Hot Work Permitted / Emergency Controls

  • Other

Fall Protection

  • Underfoot Walking Working Surface Safe

  • Handrail Systems / Perimeter Guards

  • Scaffolding Properly Installed & Inspected

  • Ladder Condition, Setup, Tie Off & Use

  • Personnel Practicing 100% Tie Off

  • Wall Openings Guarded and Holes Covered

  • Other

Confined Space

  • Permits Completed and Posted

  • Air Movement Systems in Place

  • Respiratory System Being Used

  • Supplied Air System Inspected and Signed Off

  • Confined Space Watch in Place

Electrical

  • Energy Isolation Program (LOTO)

  • GFCI in place and being used

  • Cords - Tools - Plugs Inspected & Colour-Coded

  • High Voltage Hazards Marked

  • Generators and Welders Grounded

  • Other

Equipment - Cranes, Loaders, Forklifts, Aerial Lifts & All Other Machines

  • Daily Pre-Use Inspection Completed / Signed

  • Alarms, Horns, and Warning Lights Working

  • Guards in Place / Wheel Chalks

  • Overall Safe Operation Condition

  • Other

Tools, Equipment and Rigging

  • Hand-Power Tools Free of Defects

  • Air Guns & Hoses Pinned / Check Valves

  • Slings, Chains, Rigging Inspected & Tagged

  • Saw-Horses / Cribbing

  • Other

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.