Information
-
Job Number:
-
Location:
-
Project:
-
Lead Engineer:
-
Other Engineers Onsite:
-
Date On Site:
-
Travel Time Start:
-
Travel Time End:
-
Time On Site:
-
Time Off Site:
Pre-Start Check & Works
Pre-Start Checks
-
Materials & Job Pack collected/located and checked?
-
Method Statement & Risk Assessment read, agreed & signed by all?
Till Health Checks To Be Completed Prior To Starting Installation On All Lanes. Please List Lanes Numbers For All Issues Identified.
-
Beetle Powers Up?
-
POS Screen Working? (If No - Photograph Required)
-
Customer Display Working? (If No - Photograph Required)
-
Hand Held Scanner Working?
-
Printer Working (Prints & Cuts)?
-
Is the Beetle Connected To An Electrak Socket?
-
Take Photograph Of Comms Cabinet Pre-Installation.
-
Store Representative (Name & Signature)
-
Elecomm Engineer (Name & Signature)
Installation Sign Off
Works
-
Insert SOW's
Post Installation Checks
-
Beetle Powers Up?
-
POS Screen Is Working?<br>Photograph Required
-
Customer Display Works?<br>Photograph Required
-
Hand Held Scanner Working?
-
Printer Working? (Prints & Cuts)<br>Photograph Required
-
Space Pole Installed?
-
PED Holder Installed?
-
PED Re-tethered Under Unit?
-
Cash Drawer Opens (When Hasp Lock Unlocked) Using No Sale Function?
-
Checkpoint Chassis Installed? (Specify Number/Reason Why Not As Requested)<br>Photograph Required
-
Number Of Checkout Installations Completed As Planned? (Specify Number/Reasons Why Not As Requested)
-
EPOS Cleaned? (If No Qty)
-
EPOS Repaired Using Any Residual Kit In Store? (If No Qty Reason Why Not As Requested)
-
EPOS Removed Any Residual Kit Used To Support Equipment In Store? (Specify Number/Reason Why Not As Requested)
-
What Electrical Works Completed By Integral?
-
Tether Checked On PED To Ensure It Extends Appropriately?
-
Comms Cabinet Checked/Tidied?<br>Photograph Required
-
Tills Left Out Of Action? - Give Reasons Why (If Yes Photographs Required)
-
Was The Beetle Software Reloaded?
-
Till Insert & Old Cash Drawer Clasp Left At Front Of Store (In Trolley)?
-
Number Of Electrak Power Leads Installed?
-
Serial Numbers Of The 2D Scanner (Per Till)
-
2D Scanner Barcode Update Applied?
-
Serial Numbers Of The Cash Drawers (Per Till)
-
Miscellaneous Items Provided - Please List Below
Site Sign Off
Installation Sign Off
-
Kit Removed From Site - (List Quantities & Variants)
-
Old Cash Drawers, Inserts, & Keys Recovered? (For Each Till)
-
Checkout Waste Segregated With The Store?
-
Soft Plastic In Plastic Cage?
-
Cardboard In Cardboard Cage?
-
Polystyrene Disposed Of As General Waste?
-
Area Left Clean & Tidy?
-
Equipment All Live For Store To Trade?
-
Works Completed Prior To Store Trading?
Elecomm Engineer Sign Off
-
Elecomm Representative:
-
Date & Time:
Client Sign Off
-
Onsite Representative:
-
Onsite Representative Position:
-
Date & Time: