Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select date

  • Add location
  • Initial Inspection

  • Follow Up Inspection

Description of Location

Safety/Housekeeping

Products

Before Work Starts

  • Walls 100% framed and ready

  • Foreman has confirmed all changes are up to date

  • Review all drawings that pertain to work area including equipment schedules & reflected ceiling plans

  • Prefab is in appropriate location

  • Approved materials only

Installation

  • Walls are completely marked out (F/A, Security, etc.)

  • Every box will be pigtailed & ready for trim out

Storage/Protection

Required Testing

  • Area foreman and Berg QC inspector to approve rough in before inspection is called.

Misc.

Comments

Photographs

  • Add media

  • Add media

Sketch

  • Add drawing

Berg Signature

  • Add signature

Mortenson Signature

  • Add signature

Other Witnesses

  • Add signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.