Title Page
-
Site conducted
-
First Line of Address
-
Conducted on
-
Prepared by (Crew)
Client and Property details
Client Details
-
Client Name
-
Client Phone Number
-
Client Email
Property Details
-
Full Address (including Postcode)
-
Property Type
-
Property Detachment
- Detached
- Semi-detached
- Mid-terraced
- End-terraced
- Ground floor flat
- Middle floor flat
- Top floor flat
-
Property Age
-
Domestic / Commercial
Scaffolding
-
Has Scaffolding been Erected?
-
Picture of Scaffold
-
Is scaffolding be erected safely?
Pre-Works Risk Assessment
-
Measure Carried Out
-
Does the customer understand the works being carried out?
-
Stop work and advise customer reason of visit
-
Is there a safe place to park the vehicle?
-
Why not? (Add Images)
-
Are all household items removed creating a safe working area?
-
Provide evidence of obstructions
-
Is all Electrical Equipment suitable for use? (Drills etc.)
-
Why not? (Add Images)
-
Is all Access Equipment suitable for use? (Scaffolding etc.)
-
Why not? (Add Images)
-
Is the weather suitable for install?
-
Why not? (Add Images)
-
Any other Restictions or Concerns?
-
Please Explain... (With Images)
-
Is the property listed or in a conservation area:
-
Are there any other planning issues to be considered
-
List detail of issues to be considered:
-
Is the current roof lining under an active warranty?
-
Provide details of warranty:
-
Will any form of protected species be disturbed by the installation process?
-
Provide details
Asbestos
-
Is there an asbestos report present for the job?
-
Have you read through the asbestos report before beginning the job?
-
Read the report
-
Is there any known Asbestos containing materials present in the working area?
-
Where is the Asbestos containing material present?
-
Picture of Asbestos containing material
-
Are you going to be disturbing Asbestos Containing Material?
-
How will the Asbestos Containing Material be Affected and What Safety precautions are going to be used to limit distruption?
-
Artex Encountered?
-
Would the task involve affecting the Artex?
-
Is the Artex listed on the survey as containing Asbestos Containing Materials?
-
Screenshot evidence of this
-
Do you have the relevant safety equipment to work on Asbestos containing material?
-
Installer Signature - Please sign when all relevant questions have been filled and you are happy with the precautions in place to complete potential works on Asbestos Containing Materials if present
PPE Check
-
Head Protection
-
Gloves
-
Boots
-
Eye Protection
-
High Vis Uniform
-
Protective Trousers
-
Waterproofs
Crew Work In Progress Audit
-
Works being Completed
- Roofing Crew
- Electrical Crew
-
ROOFING SECTION TO COMPLETE
-
Photo of Front Elevation
-
Which Elevation are majority of works taking place?
-
Photo of Working Environment
-
Photo of Work in Progress - (Roofer working with full PPE)
-
Photo of Rails before Panels are installed
Internal Roof
-
Is there a loft present
-
Is loft accessible
-
Images of Loft
-
Image of Loft Hatch
-
ELECTRICAL SECTION TO COMPLETE
-
Where is the majority of works taking place?
-
Photo of Working Environment
-
Photo of Work in Progress - (Electrician working with full PPE)
-
Photo of Before works
-
Photo of During works
-
Inverter Serial Number
-
Data Stamp of Panel - Picture of back of Panel
Post Works Report
-
Was the Job able to be installed safetly?
-
Reason for Unsafe Install
-
Pictures of Completed Job - Externally (Panels etc.)
-
Photo of irradiance meter on panel showing reading
-
Picture of Completed job from Ground Level
-
Pictures of Completed Job - Internally (Electrics etc.)
-
Picture of DC cable run - Please show multiple pictures at different points of the DC run
-
Picture of schematic next to inverter
-
Confirmation of Completion by the installer
-
Confirmation of Completion by the occupier - this confirms that the customer is happy with the install
Customer Satisfaction
-
Remind the customer to review us on Google by searching Evolve Home Energy Solutions and click "Write a Review"
-
Review of the customer
Summary Sheet
-
Was there any improvements we could've made on the job?
-
What improvements could be made?
-
What size system was installed?
-
How many panels were installed?
-
Could more panels have been installed?
-
How many?