Information

  • Client

  • Location
  • Conducted on

  • Duration of work activity

  • Activity covered by this assessment

  • Circumstances which will require additional assessment

1. Working at Heights

  • 1.1. Fall risks of 2m or more? (including voids, pits, and trenches)

2. Tools and Equipment

  • 2.1. Unsafe or damaged tools/equipment? (including missing or damaged guards, electrical test leads etc)

  • 2.2. Incorrect tools /equipment for job? (e.g. Non insulated screwdrivers etc)

  • 2.3 Power tools appliance tested.

  • 2.4. Test meters calibrated?

3. Loft spaces

  • 3.1. Safe and secure access to the loft (i.e loft ladder or extendable ladder safety positioned)

  • 3.2. Loft has adequate flooring to work in or a crawl board in place where work is to take place

  • 3.3 Adequate lighting in place to avoid addition risk of injury

4. Other people and animals (pets) at the property

  • 4.1. Customer and other adult occupants aware of the work area and agree to avoid entering it until work area is cleared away?

  • 4.2. Children and other vulnerable people under due care from a competent adult and restricted from entering the work zone

  • 4.3. Support systems in place for unsupervised vulnerable people. (i.e. heating kept on for elderly person, emergency call phone line still attached)

  • 4.4. Approved warning and health and safety signs on display in a prominent area?

5. Noise

  • 5.1. All occupants of the property protected from noise above 83dB(A)

6. Ladders

  • 6.1. Unsafe or damaged ladders?

  • 6.2. Unsafe positioning of ladders?

  • 6.3. Ladder not properly secured?

  • 6.4. Ladder unsuitable for job? (e.g. Step ladder used for accessing loft spaces)

7. Work area and manual Tasks

  • 7.1. Risk of exposure to live electrical contact

  • 7.3. Work area clean and tidy?

  • 7.2. Risk of damage or injury from heavy lifting?

8. Asbestos exposure

  • 8.1. Asbestos present?

9. Personal Protective Equipment (PPE)

  • 9.1. Lack of, or inadequate PPE (including sun protection)

  • 9.2. Lack of system to issue, inspect, replace and monitor PPE?

  • 9.3. Lack of training in safe use, clean-up and inspection of PPE?

10. Goods/valuables affected by work

  • 10.1. Customer property in good condition, robust enough to be moved?

  • 10.2. Perishable goods protected(i.e. freezer supply maintained during works)

  • 10.3. Customer carpets and other belongings protected from exposure to excessive dust?

11. Pre-works Survey (Electrical)

  • 11.1. Is the current system/ consumer unit capable of coping with the intended additions and/or adaptions and does it comply with BS7671?<br>

  • 11.2.. Are ALL extraneous conductive parts adequately earthed?<br>

  • 11.3. Has the maximum demand of the system been recalculated?

  • 11.4. Upon completion, what type of certificate will be required?

  • 11.5. Will the work require building control notification?

  • 11.6. Will a temporary supply be required during works?

  • 11.7 Adequate RCD Protection installed.

  • 11.8 Can works proceed once the client agree’s with the quotation/ tender?

12. Additional specific hazards identified.

  • 12.1. Electric Shock

  • 12.2. Slips and trips

  • 12.3. Other contractors working nearby

  • 12.4. Mechanical Machinery

  • 12.5. Storage of materials

Planning and Preparation

  • Action already taken to reduce risks

  • Planning

  • Physical

  • Absolute

Managerial / Supervisory

  • Specific instruction

Training

  • Specific instruction

Corrective Actions

  • Corrective actions

Section 44

  • Permit to work granted?

  • Expiry date of permit to work?

  • Name and signature of person issuing this permit to work

Sign Off

  • First operatives name and signature indicating that the content of this risk assessment will be adhered to at all times and that all work will be carried out in accordance with the health and safety at work act, the electricity at work act.

  • Second operatives name and signature indicating that the content of this risk assessment will be adhered to at all times and that all work will be carried out in accordance with the health and safety at work act, the electricity at work act.

  • (Where applicable). Client or Residents signature to agree they will take responsibility for themselves, children, guests and pets and they will remain outside of the working area at all times during works, that they will not energise all or part of the system without the permission of the onsite staff.

  • Supervisors signature giving permission for operatives to proceed works in strict accordance with all instructions of this assessment and the references made to statutory working regulations.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.