Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Site Inspected

  • Name of area or location this audit covers

  • Select date

  • Has the working area to be signed off for demolition been toughly inspected by Rowland & Briggs Electrical?

  • What methods of testing were employed to perform this testing? Please List methods employed.

Underground Excavation works

  • In the areas where excavation is to be carried out, are there any risks in finding any live cables or others services below the area to be excavated despite the testing already undertaken and completed?

  • If any cables, conduits or other services are discovered. What action should be taken?

  • Has the demolition company been made aware of risks in finding additional cables and conduits under the area to be excavated for demolition?

Above Ground Demolition Works

  • If the area to be demolished has a ceiling in place any electrical services above that ceiling line are to be considered live and must not be touched or disturbed.. Has this been explained to builder and Demolisher?

  • Have all visible and accessible cables that remain in the areas to be demolished been labeled with temporary construction tape?

Confirmation of Instructions

  • Has the Demolisher been made aware of the risks of finding live electrical cables in the rooms to be demolished?

  • Has the builder been notified of the associated risks with demolition works in the areas to be undertaken?

  • Has the Demolisher been notified of the associated risks with demolition works in the areas to be undertaken?

  • Has the Builder and Demolition Works contractor been made aware that all Electrical Cables are to be considered "Live" at all times. If there is any doubt, that a cable maybe live the Demolisher must contact the builder and notify their concerns.

Sign Off of This Audit

  • Rowland & Briggs representative authorized to sign off on this audit.

  • Builders representative authorized to sign off on this audit.

  • Demolishers representative authorized to sign off on this.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.