Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
TYPE OF UPGRADE.
-
Is this a Sub Board Upgrade?
-
Is this a Main Board Upgrade?
-
Incoming Mains Cable Upgrade?
-
RCD Upgrade?
-
Full House / Unit Rewire.
ELECTRICAL CABINET
-
Does the Electrical Mains Cabinet have Lockable Doors?
-
If Yes are they Locked and Secure?
SWITCHGEAR
-
Lighting Circuit Upgrade?
-
Power Circuit Upgrade?
-
Have all Light Switches Been Replaced And are Working Correctly?
-
Have all GPO's been Replaced and are Working Correctly?
-
Have All Light Fittings been Replaced and are Working Correctly?
CABLING
-
Has the Correct Size Cables been Used?
-
Are The Cables Run Neatly?
-
Are Cables in Conduit where Required?
-
Is All Conduit Correctly Secured With Saddles?
LABELING
-
Is each Units Sub Board Labelled With Their Unit Number?
-
Are All Circuits Clearly Labelled?
-
Are All Cable Entry Points Sealed Off With Silicon / Mortar or Fire Proof Mastik if Required?
-
Is Main Switch Labelled?
EARTHING
-
Is The Earthing Stake Location Clearly Shown in Box?
-
Is the Earth Stake in the Ground and Secure?
-
Has the Earth Stake Connections been Zinc Coated.?
-
Is there an Earth connection on the water bond?
-
Is the Earth Wire Properly Secured to the Earth Stake Using The Proper Clips?
NEUTRAL LINKS.
-
Are All Neutral Wires Correctly Installed in Neutral Link Box/s?
-
Are All Neutral Links Labeled?
COMPLETION
-
Was The Electrical Box Left Neat and Tidy,No Mess?
-
Was Any Property Damage Done That Requires Follow Up Repairs?
-
Show Some Overall Photo's of the Work
-
COMMENTS.
RATING
-
Add signature