General Information
-
Site location
-
Inspection date
-
Inspected by
-
Project/Programme reference
- Boiler
- Radiators
- Electric heaters
-
Contractor and representative
-
Customer present
Works Inspection Details
-
Gas heating upgrade checklist
-
Start sate
-
End date
-
Does boiler appear to be fitted correctly?
-
Boiler location?
-
Flue type?
-
Has the flue been installed correctly (not boxed in) and sealed externally?
-
Is all pipework neat and tidy and suitably clipped to the wall?
-
Has any pipework been boxed in?
-
Have new radiators been installed?
-
How many radiators are in the property?
-
How many radiators have been renewed?
-
Has pipework been renewed to radiators?
-
Do all radiators have new TRV's installed?
-
Has C02 alarm been fitted, is in correct position and old one removed?
-
Has a timeclock and programmer/thermostat been installed and working correctly?
-
Heating Upgrade - Are there any follow up snags?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Electrical heating upgrade
-
Start date
-
End date
-
Heater manufacture
- Dimplex Quantum
- Heatstore Intelli
- Other
-
Type of heater installed?
- Storage heater
- Panel heater
- Towel rail
- Other
-
How many storage heaters installed
-
All heaters installed correctly and free from damage?
- Yes
- No
- N/A
-
Are storage heaters floor mounted and fixed to the wall?
-
Panel heater wall mounted with fixing bracket? (Kitchen/bathroom only)
-
Is towel heater mounted to wall with fixing bracket, where applicable? (bathroom only)
-
Has customer been shown how to use heaters and instruction manual provided?
-
Electrical heating - Are there any follow up snags?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
General Site details and Sign Off
-
Has the site been left clean and tidy?
-
Has all waste been removed?
-
Is scaffolding present?
-
Has customer reported any issues?
-
Overall inspection rating?
-
Contractor agreed for snags to be completed within 5 days?
-
Places for People Initials
-
Contractor Initials
-
Customer Initials