Title Page

  • Site location

  • Inspection date

  • Inspected by

  • Project/Programme Reference

  • Contractor and site representive

  • Customer Present

  • Smoke alarms?

  • Gas in property and location of boiler?

Works Inspection Details

Rewire

  • Has the property had a rewire?

  • Has the correct number of sockets been installed in each room, including 2 USB sockets?

  • Have all chasings been patched in correctly and to a suitable standard?

  • Are all smoke alarms hard-wired and linked in the property?

  • New light switches throughtout?

  • New light pendants throughout?

  • Is earth bonding present and connected correctlt?

  • Has 100amp isolator been installed ? (Take photo of meter cupboard?

  • Has floor coverings been re-laid and there are no trip hazards?

  • Rewire - Are there any follow up snags?

Consumer unit

  • CCU replacement

  • Start date

  • End date

  • Has a new CCU unit been installed? Note location

  • Is the CCU accessible and labelled up correctly?

  • CCU snags - Are the any follow up snags?

General Site Details and Sign Off

  • Has the site been left clean and tidy?

  • Has all waste been removed?

  • Is scaffolding present?

  • Has customer reported any issues?

  • Overall inspection rating?

  • Places for People Initials

  • Contractor Initials

  • Customer Initials

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.