General Information
-
Site location
-
Inspection date
-
Inspected by
-
Project/Programme reference
- Kitchen
- Bathroom
- Additional WC
-
Contractor and representative
-
Customer present
-
Smoke alarms
- House
- Flat
- Bungalow
- Bedsit
- Living room
- Hall
- Landing
- 2nd landing
- Other
-
Gas in property and location of boiler
- Yes
- No
- N/A
Works Inspection Details
-
Kitchen upgrade
-
Start sate
-
End date
-
Are all infills/plinths/kickboards fitted correctly?
-
Are all units, back boards, and end panels, level, free from damage and doors aligned correctly and soft closures fitted?
-
Are all shelves present and fitted correctly?
-
Are all drawers fitted correctly and running smoothly?
-
Have splashbacks been installed?
-
Is upstand installed correctly?
-
Are worktops, joint and edging strips installed correctly and free from damage?
-
Are all appliance spaces correct, and appliances re-installed correctly?
-
Have all cuts outs been sealed correctly, service pipe holes the correct size, and copper pipe used?
-
Has boxing been fitted, where applicable? If yes note location
-
Have isolation valves been fitted and are accessible, including sure-stop where stop tap is located in the kitchen?
-
Has boxing been installed where applicable? If yes note where
-
Has new skirting been fitted?
-
If boiler in kitchen has new C02 alarm been fitted in correct position and old one removed?
-
Has heat detector been fitted?
-
Has new LED lighting been installed?
-
Are fuse spurs labelled correctly?
-
Has extractor fan been installed?
-
Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?
-
Has plastering been carried out to standard?
-
Is decoration complete to satisfaction standard, including woodwork?
-
Have doors and radiator painted where applicable?
-
Kitchen - Are there any follow up snags?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Bathroom Upgrade
-
Start date
-
End date
-
Have the correct bathroom fixtures and fitting been used and stickers removed?
-
Is the bath and bath panel fitted correctly and free from damage?
-
Have the basin and toilet been correctly fitted to the wall?
-
Have wall boards been fitted and sealed correctly?
-
Have shower rails & curtain been fitted correctly?
-
Is all silicone sealant to a satisfactory standard?
-
Have isolation valves been fitted, accessible and copper piping used?
-
Has any boxing been fitted?
-
Has skirting been fitted?
-
Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?
-
Has plastering been carried out to standard?
-
Has plastering been carried out to standard?
-
Is decoration complete to satisfaction standard, including woodwork?
-
Have doors and radiator painted where applicable?
-
Has a extractor fan, isolator switch, LED light and pull cord been installed?
-
Bathroom - Are there any follow up snags?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Additional WC & WHB upgrade
-
Start date
-
End date
-
Have the correct bathroom fixtures and fitting been used and stickers removed?
-
Have the basin and toilet been correctly fitted to the wall?
-
Have wall board for splashback been fitted and sealed correctly?
-
Is all silicone sealant to a satisfactory standard?
-
Have isolation valves been fitted, accessible and copper piping used?
-
Has any boxing been fitted?
-
Has skirting been fitted?
-
Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?
-
Has plastering been carried out to standard?
-
Is decoration complete to satisfaction standard, including woodwork?
-
Have doors and radiator painted where applicable?
-
Has a extractor fan, isolator switch, LED light and pull cord been installed?
-
DSWC - Are there any follow up snags?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
General Site details and Sign Off
-
Has the site been left clean and tidy?
-
Has all waste been removed?
-
Is scaffolding present?
-
Has customer reported any issues?
-
Overall inspection rating?
-
Contractor agreed for snags to be completed within 5 days?
-
Places for People Initials
-
Contractor Initials
-
Customer Initials