Title Page

  • Site location

  • Inspection date

  • Inspected by

  • Project/Programme Reference

  • Contractor and site representive

  • Customer Present

  • Smoke alarms?

  • Gas in property and location of boiler?

Works Inspection Details

  • Kitchen Upgrade

  • Start date

  • Finish date

  • Is there a utility room? If yes take photos here and add comments on kitchen questions. I.e. extractor fan

  • Has extractor fan and lighting been installed?

  • Has boxing and skirting been fitted?

  • Has the radiator and door been painted

  • Has a sure stop been installed?

  • Has flooring up to 5sqm been fitted?

  • Are infills/plinths/kickboards fitted correctly?

  • Are all units, back boards, and end panels, level, free from damage and doors aligned correctly and soft closures fitted?

  • Are all shelves present and fitted correctly?

  • Are drawers fitted correctly and running smoothly?

  • Have splash backs been installed?

  • Is upstand installed correctly?

  • Are worktops, joint and edging strips installed correctly and free from any damage?

  • Are all appliance spaces correct and appliances re-installed correctly?

  • Have cut outs been sealed correctly, service pipe holes the correct size, and copper pipe used?

  • Have isolation valves been fitted and are accessible, including sure-stop where stop tap is located in the kitchen?

  • Has boxing been installed where applicable? If yes note where

  • Has new skirting been fitted?

  • Has C02 alarm been fitted, is in correct position and old one removed?

  • Has new LED lighting been installed?

  • Are fuse spurs labelled correctly and 6 at least 6 sockets installed?

  • Has an extractor fan been installed?

  • Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?

  • Has plastering been carried to standard?

  • Is decoration complete to satisfactory standard?

  • Have radiators and doors been painted?

  • Has kitchen door been painted - one side?

  • Kitchen Snags - How many snags identified?

  • Bathroom Upgrade

  • Start date

  • Finish date

  • Have the correct bathroom fixtures/fittings been used?

  • Have stickers been removed from fixtures and fittings?

  • Is the bath and bath panel fitted correctly and free from damage?

  • Have the wall boards been installed correctly and sealed correctly?

  • Have the basin and toilet been correctly fitted to the wall?

  • Have shower rails and curtain been installed correctly?

  • Is all silicone sealant installed and to a satisfactory standard?

  • Have isolation valves been fitted and are accessible?

  • Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?

  • Has boxing been installed where applicable? If yes note where

  • Has plastering been carried to standard?

  • Is decoration complete to satisfactory standard?

  • Have doors and radiators been painted?

  • Has bathroom door been painted?

  • Has extractor fan, isolator switch, LED light and pull cord been fitted?

  • Bathroom - Are there any follow up snags? If yes, note how many

  • Downstairs/additional WC and WHB Upgrade

  • Start date

  • End date

  • Have the correct bathroom fixtures and fittings been =used ands stickers removed?

  • Have the basin and toilet been correctly fitted to the wall?

  • Has the wall-board for splashback been fitted and sealed correctly?

  • Is all silicone sealant to a satisfactory standard?

  • Have isolation valves been fitted, accessible and copper piping used?

  • Has any boxing been fitted, if so has it been installed to a good standard?

  • Has skirting been fitted, if so has it been installed to a good standard?

  • Has vinly floor been fitted correctly. sealed to the edges and threshold fitted where applicable?

  • Has plastering been carried to standard?

  • Is decoration complete to satisfactory standard?

  • Has radiator been painted?

  • Has door been painted?

  • Has extractor fan, isolator switch been fitted, LED lighting and pull cord installed?

  • DSWC - Are there any follow up snags? If yes, note how many

  • Window Replacement Checklist

  • Start date

  • End date

  • Type of window installed

  • Have all windows been installed to a good standard, free from damage and scratches, and has the correct glass been fitted?

  • Are all windows sealed correctly?

  • Are all windows operating correctly?

  • Are all restrictors working correctly?

  • Has all making good been completed to internal areas around windows?

  • Has all making good been completed to external areas around windows?

  • Are window handles a push button with no locks/keys?

  • Windows - Are there any follow up snags? If yes, note how many

  • Entrance Door Replacement Checklist

  • Start date

  • End date

  • Flat fire door?

  • Is there labels to show the door is certified?

  • Does the door open and close freely?

  • Is there are mechanical door closer?

  • Are the 3 or more hinges with no missing screws?

  • Are there any gaps of more than 4mm around the door frame

  • Is there a smoke threshold seal?

  • Does the lock hold the door firmly in the door frame?

  • Is the door fitted with a thumb turn and door chain?

  • Has the customer received all the keys?

  • Are all door numerals, handles, letter-plate, door viewer present and correctly fitted?

  • Has all making good been completed?

  • Dwelling door?

  • Door location

  • Door material

  • Is the door fitted correctly opening freely?

  • Is the door fitted with a thumb-turn?

  • Has customer received all keys?

  • Are draft excluders present?

  • Are all door numerals, handles, letter-plates, door viewer present and fitted correctly?

  • Has all making good been completed?

  • Doors - Are there any follow up snags? If yes, note how many

  • Roof/Roofline Checklist

  • Start date

  • End date

  • Type of roof?

  • Have the correct tiles been used?

  • Is the lead valley clear of any debris?

  • Has dry verge been installed

  • Has satellite dish been put back?

  • Have BT cables been removed, tided up where applicable

  • Roof - Are there any follow up snags? If yes, note how many

  • Secondary roof?

  • Start date

  • End date

  • Type of secondary roof?

  • Type of roof

  • Have the correct tiles been used?

  • Has dry verge been installed?

  • Secondary roof - Are there any follow up snags? If yes, note how many?

  • Have any roofline components been replaced?

  • Start date

  • End date

  • Have rainwater goods been replaced? Note amount of downpipes

  • Have fascia's & soffits been replaced?

  • Are downpipe clips all present and free from damage?

  • Roofline/RWG's - Are there any follow up snags? If yes, note how many?

  • Electrical rewire and CCU Checklist

  • Start date

  • End date

  • Have the correct number of sockets been installed in each room, including 2 USB sockets?

  • Have all chasings been patched in correctly and to a suitable standard?

  • Are all smoke alarms hard-wired and linked in the property?

  • Has new consumer unit been installed, accessible and labelled correctly?

  • New light switches throughout?

  • New light pendants throughout?

  • Is earth bonding present and connected correctly?

  • Has 100amp isolator been installed? (Take photo of meter cupboard)

  • Rewire/CCU - Are there any follow up snags? If yes, note how many

  • Heating Upgrade Checklist

  • Start date

  • End date

  • Does boiler appear to be fitted correctly?

  • Flue type

  • Has the flue been installed correctly (not boxed in) and sealed externally?

  • Is all pipework neat and tidy and suitable clipped to the wall?

  • New radiators installed?

  • How many radiators in property?

  • Do all radiators have new TRV's installed?

  • Has timeclock and programmer/thermostat been installed and working correctly?

  • Has C02 alarm been fitted, is in correct position and old one removed?

  • Heating/Rads - Are there any follow up snags? If yes, note how many?

  • Storage Heating Checklist

  • Start date

  • End date

  • Type of heater installed

  • Are heaters installed correctly and free from damage?

  • Are heaters floor mounted and fixed to the wall?

  • Has customer been shown how to use heaters?

  • Electric heating - Are there any follow up snags? If yes, note how many

General Site Details and Sign Off

  • Has the site been left clean and tidy?

  • Has all waste been removed?

  • Is scaffolding present?

  • Has customer reported any issues?

  • Overall inspection rating?

  • Places for People Initials

  • Contractor Initials

  • Customer Initials

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.