Title Page
-
Site location
-
Inspection date
-
Inspected by
-
Project/Programme Reference
- Kitchen
- Bathroom
- WC
- Roofline & RWG
- Doors
- Windows
- Gas heating
- Radiators
- Electric heating
- CCU
- Rewire
-
Contractor and site representive
-
Customer Present
-
Smoke alarms?
- House
- Flat
- Bungalow
- Bedsit
- Hall
- Landing
- Landing 2
- Other
- Living room
- N/A
-
Gas in property and location of boiler?
Works Inspection Details
-
Heating Upgrade Checklist
-
Start date
-
End date
-
Does boiler appear to be fitted correctly?
-
Flue type
-
Has the flue been installed correctly (not boxed in) and sealed externally?
-
Is all pipework neat and tidy and suitable clipped to the wall?
-
Has C02 alarm been fitted, is in correct position and old one removed?
-
New radiators installed?
-
How many radiators in property?
-
How many radiators renewed?
-
Has pipework been renewed to radiators?
-
Do all radiators have new TRV's installed?
-
Has timeclock and programmer/thermostat been installed and working correctly?
-
Heating/Rads - Are there any follow up snags? If yes, note how many?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Storage Heating Checklist
-
Start date
-
End date
-
Heater manufacture
-
Type of heater installed
- Storage heater
- Panel heater
- Towel rail
- Other
-
How many heaters installed?
-
Are heaters installed correctly and free from damage?
-
Are heaters floor mounted and fixed to the wall?
-
Panel heater - Wall mounted with fixing bracket? (Kitchen and bathroom only)
-
Towel heater - Mounted to wall with fixing bracket? (Bathroom only)
-
Has customer been shown how to use heaters and instruction manual provided?
-
Electric heating - Are there any follow up snags? If yes, note how many
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
General Site Details and Sign Off
-
Has the site been left clean and tidy?
-
Has all waste been removed?
-
Is scaffolding present?
-
Has customer reported any issues?
-
Overall inspection rating?
-
Places for People Initials
-
Contractor Initials
-
Customer Initials