Title Page
-
Site location
-
Inspection date
-
Inspected by
-
Project/Programme Reference
- Kitchen
- Bathroom
- WC
- Roofline & RWG
- Doors
- Windows
- Gas heating
- Radiators
- Electric heating
- CCU
- Rewire
-
Contractor and site representive
-
Customer Present
-
Smoke alarms?
- House
- Flat
- Bungalow
- Bedsit
- Hall
- Landing
- Landing 2
- Other
- Living room
- N/A
-
Gas in property and location of boiler?
Works Inspection Details
-
Kitchen Upgrade
-
Start date
-
Finish date
-
Are infills/plinths/kickboards fitted correctly?
-
Are all units, back boards, and end panels, level, free from damage and doors aligned correctly and soft closures fitted?
-
Are all shelves present and fitted correctly?
-
Are drawers fitted correctly and running smoothly?
-
Have splash backs been installed?
-
Is upstand installed correctly?
-
Are worktops, joint and edging strips installed correctly and free from any damage?
-
Are all appliance spaces correct and appliances re-installed correctly?
-
Have cut outs been sealed correctly, service pipe holes the correct size, and copper pipe used?
-
Have isolation valves been fitted and are accessible, including sure-stop where stop tap is located in the kitchen?
-
Has boxing been installed where applicable? If yes note where
-
Has new skirting been fitted?
-
Has C02 alarm been fitted, is in correct position and old one removed?
-
Has new LED lighting been installed?
-
Are fuse spurs labelled correctly and 6 at least 6 sockets installed?
-
Has an extractor fan been installed?
-
Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?
-
Has plastering been carried to standard?
-
Is decoration complete to satisfactory standard?
-
Have radiators and doors been painted?
-
Has kitchen door been painted - one side?
-
Kitchen Snags - How many snags identified?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Bathroom Upgrade
-
Start date
-
Finish date
-
Have the correct bathroom fixtures/fittings been used?
-
Have stickers been removed from fixtures and fittings?
-
Is the bath and bath panel fitted correctly and free from damage?
-
Have the wall boards been installed correctly and sealed correctly?
-
Have the basin and toilet been correctly fitted to the wall?
-
Have shower rails and curtain been installed correctly?
-
Is all silicone sealant installed and to a satisfactory standard?
-
Have isolation valves been fitted and are accessible?
-
Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?
-
Has boxing been installed where applicable? If yes note where
-
Has plastering been carried to standard?
-
Is decoration complete to satisfactory standard?
-
Have doors and radiators been painted?
-
Has bathroom door been painted?
-
Has extractor fan, isolator switch, LED light and pull cord been fitted?
-
Bathroom - Are there any follow up snags? If yes, note how many
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Downstairs/additional WC and WHB Upgrade
-
Start date
-
End date
-
Have the correct bathroom fixtures and fittings been =used ands stickers removed?
-
Have the basin and toilet been correctly fitted to the wall?
-
Has the wall-board for splashback been fitted and sealed correctly?
-
Is all silicone sealant to a satisfactory standard?
-
Have isolation valves been fitted, accessible and copper piping used?
-
Has any boxing been fitted, if so has it been installed to a good standard?
-
Has skirting been fitted, if so has it been installed to a good standard?
-
Has vinly floor been fitted correctly. sealed to the edges and threshold fitted where applicable?
-
Has plastering been carried to standard?
-
Is decoration complete to satisfactory standard?
-
Has radiator been painted?
-
Has door been painted?
-
Has extractor fan, isolator switch been fitted, LED lighting and pull cord installed?
-
DSWC - Are there any follow up snags? If yes, note how many
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Window Replacement Checklist
-
Start date
-
End date
-
Type of window installed
-
Have all windows been installed to a good standard, free from damage and scratches, and has the correct glass been fitted?
-
Are all windows sealed correctly?
-
Are all windows operating correctly?
-
Are all restrictors working correctly?
-
Has all making good been completed to internal areas around windows?
-
Has all making good been completed to external areas around windows?
-
Are window handles a push button with no locks/keys?
-
Windows - Are there any follow up snags? If yes, note how many
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Entrance Door Replacement Checklist
-
Start date
-
End date
-
Flat fire door?
- Yes
- No
-
Is there labels to show the door is certified?
-
Does the door open and close freely?
-
Is there are mechanical door closer?
-
Are the 3 or more hinges with no missing screws?
-
Are there any gaps of more than 4mm around the door frame
-
Is there a smoke threshold seal?
-
Does the lock hold the door firmly in the door frame?
-
Is the door fitted with a thumb turn and door chain?
-
Has the customer received all the keys?
-
Are all door numerals, handles, letter-plate, door viewer present and correctly fitted?
-
Has all making good been completed?
-
Dwelling door?
-
Door location
- Front
- Rear
- Patio
- French door
- Store
- Other
-
Door material
- UPVC
- Composite
- Fire
-
Is the door fitted correctly opening freely?
-
Is the door fitted with a thumb-turn?
-
Has customer received all keys?
-
Are draft excluders present?
-
Are all door numerals, handles, letter-plates, door viewer present and fitted correctly?
-
Has all making good been completed?
-
Doors - Are there any follow up snags? If yes, note how many
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Roof/Roofline Checklist
-
Start date
-
End date
-
Type of roof?
-
Have the correct tiles been used?
-
Is the lead valley clear of any debris?
-
Has dry verge been installed
-
Has satellite dish been put back?
-
Have BT cables been removed, tided up where applicable
-
Roof - Are there any follow up snags? If yes, note how many
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Secondary roof?
-
Start date
-
End date
-
Type of secondary roof?
- Porch
- Store cupboard
- Other
- N/A
-
Type of roof
- Pitched
- Flat
- Other
- Not required
-
Have the correct tiles been used?
-
Has dry verge been installed?
-
Secondary roof - Are there any follow up snags? If yes, note how many?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Have any roofline components been replaced?
-
Start date
-
End date
-
Have rainwater goods been replaced? Note amount of downpipes
-
Have fascia's & soffits been replaced?
-
Are downpipe clips all present and free from damage?
-
Roofline/RWG's - Are there any follow up snags? If yes, note how many?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Electrical rewire and CCU Checklist
-
Start date
-
End date
-
Have the correct number of sockets been installed in each room, including 2 USB sockets?
-
Have all chasings been patched in correctly and to a suitable standard?
-
Are all smoke alarms hard-wired and linked in the property?
-
Has new consumer unit been installed, accessible and labelled correctly?
-
New light switches throughout?
-
New light pendants throughout?
-
Is earth bonding present and connected correctly?
-
Has 100amp isolator been installed? (Take photo of meter cupboard)
-
Rewire/CCU - Are there any follow up snags? If yes, note how many
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Heating Upgrade Checklist
-
Start date
-
End date
-
Does boiler appear to be fitted correctly?
-
Flue type
-
Has the flue been installed correctly (not boxed in) and sealed externally?
-
Is all pipework neat and tidy and suitable clipped to the wall?
-
New radiators installed?
-
How many radiators in property?
-
Do all radiators have new TRV's installed?
-
Has timeclock and programmer/thermostat been installed and working correctly?
-
Has C02 alarm been fitted, is in correct position and old one removed?
-
Heating/Rads - Are there any follow up snags? If yes, note how many?
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
-
Storage Heating Checklist
-
Start date
-
End date
-
Type of heater installed
-
Are heaters installed correctly and free from damage?
-
Are heaters floor mounted and fixed to the wall?
-
Has customer been shown how to use heaters?
-
Electric heating - Are there any follow up snags? If yes, note how many
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
General Site Details and Sign Off
-
Has the site been left clean and tidy?
-
Has all waste been removed?
-
Is scaffolding present?
-
Has customer reported any issues?
-
Overall inspection rating?
-
Places for People Initials
-
Contractor Initials
-
Customer Initials