Title Page

  • Site location

  • Inspection date

  • Inspected by

  • Project/Programme Reference

  • Contractor and site representive

  • Customer Present

  • Smoke alarms?

  • Gas in property and location of boiler?

Works Inspection Details

Kitchen

  • Kitchen Upgrade

  • Start date

  • Finish date

  • Does the property have a utility room? If yes include in questions below & take photos here

  • Has extractor fan and lighting been installed?

  • Has boxing and skirting been fitted?

  • Has the radiator and door been painted?

  • Has a sure stop been installed?

  • Has flooring up to 5 sqm been fitted?

  • Are infills/plinths/kickboards fitted correctly?

  • Are all units, back boards, and end panels, level, free from damage and doors aligned correctly and soft closures fitted?

  • Are all shelves present and fitted correctly?

  • Are drawers fitted correctly and running smoothly?

  • Have splash backs been installed?

  • Is upstand installed correctly?

  • Are worktops, joint and edging strips installed correctly and free from any damage?

  • Are all appliance spaces correct and appliances re-installed correctly?

  • Have cut outs been sealed correctly, service pipe holes the correct size, and copper pipe used?

  • Have isolation valves been fitted and are accessible, including sure-stop where stop tap is located in the kitchen?

  • Has boxing been installed where applicable? If yes note where

  • Has new skirting been fitted?

  • If boiler in kitchen has new C02 alarm been fitted, is in correct position and old one removed?

  • Has a heat detector been fitted (combined with C02 if boiler in kitchen)

  • Has new LED lighting been installed?

  • Are fuse spurs labelled correctly and at least 6 sockets installed?

  • Has an extractor fan been installed?

  • Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?

  • Has plastering been carried to standard?

  • Is decoration complete to satisfactory standard?

  • Has kitchen radiator been painted?

  • Have kitchen door been painted?

  • Kitchen - Are there any follow up snags? If yes, note how many

Bathroom

  • Bathroom Upgrade

  • Start date

  • Finish date

  • Have the correct bathroom fixtures/fittings been used?

  • Have stickers been removed from fixtures and fittings?

  • Is the bath and bath panel fitted correctly and free from damage?

  • Have the wall boards been installed correctly and sealed correctly?

  • Have the basin and toilet been correctly fitted to the wall?

  • Have shower rails and curtain been installed correctly?

  • Is all silicone sealant installed and to a satisfactory standard?

  • Have isolation valves been fitted and are accessible?

  • Has vinyl floor been fitted correctly, sealed to the edges and threshold fitted where applicable?

  • Has boxing been installed where applicable? If yes note where

  • Has plastering been carried to standard?

  • Is decoration complete to satisfactory standard?

  • Has bathroom radiator been painted?

  • Has bathroom door been painted?

  • Has extractor fan, isolator switch, LED light and pull cord been fitted?

  • Bathroom - Are there any follow up snags? If yes, note how many

Additional WC

  • Downstairs/additional WC and WHB Upgrade

  • Start date

  • End date

  • Have the correct bathroom fixtures and fittings been =used ands stickers removed?

  • Have the basin and toilet been correctly fitted to the wall?

  • Has the wall-board for splashback been fitted and sealed correctly?

  • Is all silicone sealant to a satisfactory standard?

  • Have isolation valves been fitted, accessible and copper piping used?

  • Has any boxing been fitted, if so has it been installed to a good standard?

  • Has skirting been fitted, if so has it been installed to a good standard?

  • Has vinyl floor been fitted correctly. sealed to the edges and threshold fitted where applicable?

  • Has plastering been carried to standard?

  • Is decoration complete to satisfactory standard?

  • Has radiator been painted?

  • Has WC door been painted?

  • Has extractor fan, isolator switch been fitted, LED lighting and pull cord installed?

  • DSWC - Are there any follow up snags? If yes, note how many

General Site Details and Sign Off

  • Has the site been left clean and tidy?

  • Has all waste been removed?

  • Is scaffolding present?

  • Has customer reported any issues?

  • Overall inspection rating?

  • Places for People Initials

  • Contractor Initials

  • Customer Initials

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.