Information
-
Document No.
-
Add location
Kitchen / Bathroom Upgrading Programme
-
Tenant name
-
Tenant address
-
Contact telephone number
Tenant choices
-
Kitchen Unit
-
Worktops
-
Flooring
- Kitchen - Ecru 815
- Kitchen - Shale 805
- Kitchen - Riviera 845
- Kitchen - Sepia 820
- Bathroom - Ecru 815
- Bathroom - Shale 805
- Bathroom - Riviera 845
- Bathroom - Sepia 820
I agree to the choices I have made and accept that no alterations can be made once tenant signature obtained.
-
I understand the process of the installation for my kitchen / bathroom.
-
I have been notified of an approximate start date and how long the process is Iikely to take.
-
I understand that it is my responsibility to remove all personal belongings and appliances prior to the installation of my kitchen / bathroom.
-
I agree to the proposed planned layout and accept the proposed design.
-
I understand that I need to return my customer satisfaction questionnaire, following which I will receive my decoration allowance.
-
I have read and understood all of the above.
-
Add signature
For office use only
-
Proposed Start Date
-
Survey Completed
-
Disclaimer obtained
KITCHEN UPGRADE
ELECTRIC
-
Install cooker unit
-
Contractor if not SPC:
-
Replace existing cooker control unit face plate
-
Contractor if not SPC:
-
Replace existing cooker control outlet face plate
-
Contractor if not SPC:
-
Relocate existing cooker control unit & outlet
-
Contractor if not SPC:
-
Install new extractor fan (inc hole cutting)
-
Contractor if not SPC:
-
Additional 2 switch socket (No)
-
Contractor if not SPC:
-
Replace existing 2 switch socket face plate (No)
-
Contractor if not SPC:
-
Relocate an existing 2 switch socket
-
Contractor if not SPC:
-
Install single switch socket with fused spur
-
Contractor if not SPC:
-
Relocate existing single switch socket & fused spur
-
Contractor if not SPC:
-
Replace single switch socket fused spur face plate
-
Contractor if not SPC:
-
Additional wiring to suit new layout (M)
-
Contractor if not SPC:
-
Renew all necessary bonding (No)
-
Contractor if not SPC:
-
Test all new & altered electrical installations (No)
-
Contractor if not SPC:
GAS
-
Provide new or extend gas supply to cooker (m)
-
Contractor if not SPC:
-
Test all new & altered gas installations (No)
-
Contractor if not SPC:
FLOORING
-
Take up existing floor (M2)
-
Contractor if not SPC:
-
Screed flooring (M2)
-
Contractor if not SPC:
-
Renew flooring (M2)
-
Contractor if not SPC:
ADDITIONAL
-
Remove wall tiles (M2)
-
Contractor if not SPC:
-
Renew wall tiles (M2)
-
Contractor if not SPC:
-
Replace taps
-
Contractor if not SPC:
-
Lever taps required?
-
Contractor if not SPC:
-
Supply & fit washing machine pipe fittings
-
Contractor if not SPC:
BATHROOM UPGRADE
-
Replace bath (Size)
-
Contractor if not SPC:
-
Bath mixer valve / Curtain / + Rail / Riser bar
-
Contractor if not SPC:
-
Lever taps required
-
Contractor if not SPC:
-
Replace WHB and Pedestal
-
Contractor if not SPC:
-
Replace WC Pan
-
Contractor if not SPC:
-
Replace WC Cistern
-
Contractor if not SPC:
-
End panel
-
Contractor if not SPC:
-
Side panel
-
Contractor if not SPC:
-
Remove wall tiles (M2)
-
Contractor if not SPC:
-
Renew wall tiles (M2)
-
Contractor if not SPC:
FLOORING
-
Take up existing floor (M2)
-
Contractor if not SPC:
-
Screed flooring (M2)
-
Contractor if not SPC:
-
Renew flooring (M2)
-
Contractor if not SPC:
ELECTRICS
-
Enclosed low energy light fitting
-
Contractor if not SPC:
-
Install new extractor fan (inc hole cutting)
-
Contractor if not SPC:
-
Provide RCBO to bathroom circuits
-
Contractor if not SPC:
-
Shower circuit
-
Contractor if not SPC:
-
Additional Notes / Special Requirements etc
-
Add media