Title Page
-
Address
-
Conducted on
Installation pictures
-
Take picture of the incoming supply including the earthing arrangement
-
Take picture of new SPV consumer unit with labels
-
Take picture of MCB / RCBO labelled
-
Take a picture of the generation meter clearly showing serial number
-
Take picture of AC isolator labelled
-
Take a picture of Gas & water bonding or a picture showing test result below 0.05 ohms
-
Take picture of Henley block showing new meter tails connected
-
Take picture of CT clamp - showing arrow pointing towards the grid
-
Take picture of inverter and battery installation (step back to take picture)
-
Take picture of the inverter labelled
-
Take picture of inverter data plate clearly showing Serial number and inverter model
-
Take pictures of serial numbers for each battery and BMS box
-
Take picture of inverter screen showing normal operation and generating
-
Take screenshot picture showing system added to the associated app
-
Take pictures of tester showing string voltage, picture of each string
-
Picture of conduit/trunking run externally/internally
-
Take picture of DC cables labelled
-
Take picture of schematic/shut down procedure
-
Take a picture showing panels on roof (step back as far as possible for clear picture)
Installation Questions
-
What type of arrangment is the electrical supply, TNCS, TNS OR TT ?
-
What is fuse is the main cut out ? and fuse size
-
List the result taken for ZE
-
List the result taken for PFC
-
List the result taken for ZS of the new solar circuit
-
List the result taken for ZS of any additional circuits (EV)
-
List the result taken for RCD trip time @ x1
-
Where is the new consumer unit located
-
Please list if any additional items installed e.g EV Charger or Power diverter
-
Please list inverter serial number
-
Please list generation meter serial number
Completion
-
Operatives Signature
-
Operatives Name
-
Customer Signature
-
Customer Name