Information
-
JOB NUMBER
-
CUSTOMER
-
Conducted on
-
Prepared by
-
Room picture
1. Wall Plates.
-
Level<br>
-
Labelled
-
Clean
-
Correct Type
-
Fixing
2. Termination
-
Insulation
-
Strain Relief
-
Shell Secure
-
Crimping
-
Soldering
3. Cable Sock
-
All cables exposed or susceptible to damage covered?
4. Rack and Equipment Wiring
-
Tidy & Clean
-
Cables Labelled
-
Rack Cabling
-
240V Safe
-
Ventilation in Place
-
Loom length allows service
-
Equipment labelled to allow use
-
Equipment Servicable
-
24 hour soak test & 240V reset
-
Build label
5. Mounting Hardware
-
Structurally safe
-
No vibration
-
Correct materials
6. Keystone
-
H Reading
-
V Reading
7. Operational - Mechanical
-
Screens
-
Lifts
-
Blinds
-
PIR
-
Lights
-
Reeds
8. Operational - Source
-
All destinations reached by all sources.
9. Operational - Display
-
All signal formats displayed from all sources.
10. Operational - Sound
-
Polarity all sources.
-
All speakers tested.
11. Schematic
-
All connections tested and marked on the schematic.
12. Service Stickers
-
Installed
13. Serial Numbers
-
All Gathered
-
Returned to management.
14. Manuals
-
Left with Client.
-
Returned to management.
15. Loose Items
-
HDMI or VGA/Audio cable.<br>Quantity?
16. Equipment List
-
All items ticked off.
17. Security Locked
-
Software
-
Hardware
18. Remotes
-
Labelled
-
Attached
-
Signed for
19. Site Cleaned
-
Rubbish removed.
-
Vacuumed
20. Work to Do
-
Work to do list created and attached.
-
Signature of Filer
-
Signature of Client (if present for testing)