Record working pressures & temperatures on process log sheet.
-
Check fire alarm panel for normal operation (replace any burned out bulbs)
-
Clear means of egress for CNG trailers.
-
Walk the system , check for odors and leaks.
-
Check with relieved operator for any locked-out or tagged-out equipment.
-
Be sure the fire protection system on trailers is charged.
-
Compressor 1 check piping & tubing for obvious leaks,loose connections, check for loose clamps, or unusual noises.
-
Day tank. Oval. Comp/H. Comp/L. Hours
-
Compressor 2 check piping and tubing for obvious leaks, loose connections, check for loose clamps , or unusual noises.
-
Day tank. Overall. Comp/H. Comp/L. Hours
-
Compressor 3 check piping and tubing for obvious leaks, loose connections, check for loose clamps or unusual noises.
-
Day tank. Oval. Comp/H. Comp/L. Hours
-
Compressor 4. Check piping and tubing for obvious leaks, loose connections, check for loose clamps and or unusual noises.
-
Day tank. Oval. Comp/H. Comp/L. Hours
-
Dispenser 1. Check for odor and leaks, inspect dispenser hoses and fittings for damage, MVP -81 valves are off when not in use.
-
Dispenser 2. Check for odor and leaks , inspect dispenser hoses & fittings for damage ,MV 81 valve is closed when not in use.
-
Dispenser 3 check for odor leaks, inspect hoses and fittings for damage, MV-81 valve is off when not in use
-
Dispenser 4 check for leaks, inspect hoses and fittings for damage,MV-81 valve is off when not in use.
-
Atlas air compressor, drain any condensate from receiver traps
-
Atlas # 1 Oil level:
-
Atlas # 2 Oil level :
-
Instrument air pressures Tank pressure Line pressure