Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

HVAC - Pre-Install

  • WAIT ROOM TSTAT

  • What is the current temperature at the original thermostat?

  • What is the current cool set-point at the original thermostat?

  • What is the current heat set-point at the original thermostat?

  • What type of Thermostat is in the waiting room?

  • What has the stage settings been programmed to?

  • What is the wait room cooling temperature prior to installation? (at vent)

  • What is the wait room heating temperature prior to installation?(at vent)

  • Second Stage Only

  • What is the wait room 2nd stage cooling temperature prior to installation?(at vent)

  • What is the wait room 2nd stage heating temperature prior to installation?(at vent)

  • Please take photo of wait room tstat wiring.

  • SHOWROOM TSTAT

  • What type of Thermostat is in the Show room?

  • What has the stage settings been programmed to?

  • What is the showroom cooling temperature prior to installation?(at vent)

  • What is the showroom heating temperature prior to installation?(at vent)

  • Second Stage Only

  • What is the show room 2nd stage cooling temperature prior to installation?(at vent)

  • What is the show room 2nd stage heating temperature prior to installation?(at vent)

  • Please take photo of show room tstat wiring.

  • Are there any HVAC problems prior to starting work?

  • If YES above. Has facilities been notified?

  • Any special notes or problems with HVAC system?

Compressors Pre-Install

  • COMPRESSOR 1

  • Is there any physical damage to compressor 1? If yes please attach photo and describe.

  • If YES above. Has facilities been contacted about the problem?

  • What is the pressure of compressor 1 prior to starting?

  • Does compressor 1 cycle when pressure is released?

  • COMPRESSOR 2

  • Is there any physical damage to compressor 2? If yes please attach photo and describe.

  • If YES above. Has facilities been contacted about the problem?

  • What is the pressure of compressor 2 prior to starting?

  • Does compressor 2 cycle when pressure is released?

Lighting Information

  • Does the store have new lights?

  • If "no" above please complete addition lighting survey form.

HVAC Post Installation

  • WAIT ROOM TSTAT

  • What model thermostat is installed?

  • Has wait room thermostats been programmed to reflect the system type listed above? Please Select program type.

  • What has the stage settings been programmed to?

  • Has the scheduler been set to off in system programming and have you adjusted status display settings?

  • Has EEC control been set to 0?

  • What is the wait room cooling temperature after installation?

  • What is the wait room heating temperature after installation?

  • Second Stage Only

  • What is the wait room 2nd stage cooling temperature after installation?

  • What is the wait room 2nd stage heating temperature after installation?

  • SHOWROOM TSTAT

  • What model thermostat is installed?

  • Has showroom thermostats been programmed to reflect the system type listed above? Please Select program type.

  • What has the stage settings been programmed to?

  • Has the scheduler been set to off in system programming and have you adjusted status display settings?

  • Has EEC control been set to 0?

  • What is the showroom cooling temperature after installation?

  • What is the showroom heating temperature after to installation?

  • Second Stage Only

  • What is the show room 2nd stage cooling temperature after installation?

  • What is the show room 2nd stage heating temperature after installation?

  • Any special notes or problems with HVAC system?

Control Panel

  • Is the control panel securely mounted and grounded?

  • Please provide a photo of panel installation.

  • Is the data connections complete and active?

  • Does the store have MPLS installed?

  • If YES above. Has the data been connected to port 43 of the network switch and labeled EMS?

  • Please provide a photo of data connection.

Compressor Post Installation

  • Has compressor 1 been tested and operating correctly?

  • What is the pressure of compressor 1 after installation?

  • Please provide a photo of the electrical connections for compressor 1.

  • Has compressor 2 been tested and operating correctly?

  • What is the pressure of compressor 2 after installation?

  • Please provide a photo of the electrical connections for compressor 2.

Relay Configuration

  • Is the Showroom relay installed and tested? If yes please indicate circuit and panel numbers and if connected to a contactor.

  • Is the Service Area 1 relay installed and tested? If yes please indicate circuit and panel numbers and if connected to a contactor.

  • Is the Service Area 2 relay installed and tested? If yes please indicate circuit and panel numbers and if connected to a contactor.

  • Is the Exterior relay installed and tested? If yes please indicate circuit and panel numbers and if connected to a contactor.

  • Is the Storage 1 relay installed and tested? If yes please indicate circuit and panel numbers and if connected to a contactor.

  • Is the Storage 2 relay installed and tested? If yes please indicate circuit and panel numbers and if connected to a contactor.

  • Is the EH Fan relay installed and tested? If yes please indicate circuit and panel numbers and if connected to a contactor.

  • Is the EH Fan 2 relay installed and tested? If yes please indicate circuit and panel numbers and if connected to a contactor.

  • Please list any additional relays installed and indicate panel numbers and if connected to a contactor. Please list any special notes about the relays or electrical panels.

  • Please provide multiple photos of installed relays and electrical panels.

System Testing and Operation Review

  • Has the date and time been set on the panel?

  • Has the open flag been set correctly?

  • Have all the opening & closing times and set points been programmed?

  • Have you trained the manager on normal override with red button to be used during or after hours if a relay does not turn on including compressors or late nights?

  • Have you trained the manager on manual override and showed them where the documentation is listed in the event the red button does not turn on a device.

  • Have you explained to the manager not to use the disconnects for shutting down compressors anymore?

  • Have you left the manager with our FAQ sheet and contact information?

Sign Off

  • Managers Signature

  • Tech signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.