Title Page
-
Site conducted
-
Work Order No.
-
Conducted on
-
Operator Name
-
Drawing Reference (Top Cap)
- FD1000114
- ME-014-02
- ME-012-02
- ME-028-02
- FD1000307-002
- FD1000307-001
-
Top Cap Part No.
-
Drawing Reference (Bottom Cap)
- FD1000115
- FD1000145
- ME-014-03
- ME-014-02
- ME-013-03
- ME-028-03
- FD1000307-001
- FD1000307-002
-
Bottom Cap Part No.
- Z-ME-000-26-01
- Z-ME-012-03-01
- Z-ME-014-03-01
- Z-ME-000-23-01
- Z-ME-028-02-01
- Z-ME-100-02-04
First Run Off Inspection (every start up, model change over or shift change)
First Run Off Inspection
-
Time
Top Cap
-
Weight (kg)
-
Media Pack Fit
-
PU Depth (mm)
-
Media Coverage
Bottom Cap
-
Weight (kg)
-
Media Pack Fit
-
PU Depth (mm)
-
Media Coverage
-
Curing Time (minutes)
-
Hardness Test
- Pass
- Fail
In-Process Control Check (Frequency: every 1 hour)
- In-Process Control Check
-
Time
Top Cap
-
Weight (kg)
-
Media Pack Fit
-
PU Depth (mm)
-
Media Coverage
Bottom Cap
-
Weight (kg)
-
Media Pack Fit
-
PU Depth (mm)
-
Media Coverage
Verified by:
-
Verified by: