Title Page
-
Site conducted
-
Work Order No.
-
Conducted on
-
Operator Name
-
Machine No.
-
Shift
PU Ratio
- PU Ratio Check
-
Time
-
Component A (Polyol) kg.
-
Component B (Isocyanate) kg.
-
Ratio
Verified by:
-
Add signature
Title Page
Site conducted
Work Order No.
Conducted on
Operator Name
Machine No.
Shift
PU Ratio
Time
Component A (Polyol) kg.
Component B (Isocyanate) kg.
Ratio
Verified by:
Add signature
PU Ratio Control Sheet