Title Page

  • Site conducted

  • Work Order No.

  • Conducted on

  • Operator Name

  • Drawing Reference

First Run Off Inspection (every start up, model change over or shift change)

First Run Off Inspection

  • Time

  • Cut Off on Ink Mark

  • Left Side Coverage

  • Right Side Coverage

  • Seam Seal Quality

  • Height of Media Against Faceguard

  • Assembly Appearance

  • Sufficient Seam Seal (Peel Test)

In-Process Control Check (Frequency: every 1 hour)

    In-Process Control Check
  • Time

  • Cut Off on Ink Mark

  • Left Side Coverage

  • Right Side Coverage

  • Seam Seal Quality

  • Height of Media Against Faceguard

  • Assembly Appearance

  • Sufficient Seam Seal (Peel Test)

Verified by:

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.