Title Page
-
Site conducted
-
Work Order No.
-
Conducted on
-
Operator Name
-
Drawing Reference
- FD1000113-1
- FD1000113-2
- FD1000113-3
- FD1000113-4
- FD1000113-5
- FD1000113-6
- FD1000159-4
- FD1000159-5
- ME-018-06-03
- GB00399397
- ME-016-06
- ME-014-06-01
- ME-014-06-02
- ME-014-06-03
- ME-015-05-01
- ME-015-05-02
- ME-015-05-03
- ME-024-07-02
- ME-028-06-01
- ME-028-06-02
- ME-020-04-03
- FD1000312
- 1398627
First Run Off Inspection (every start up, model change over or shift change)
First Run Off Inspection
-
Time
-
Cut Off on Ink Mark
-
Left Side Coverage
-
Right Side Coverage
-
Seam Seal Quality
-
Height of Media Against Faceguard
-
Assembly Appearance
-
Sufficient Seam Seal (Peel Test)
In-Process Control Check (Frequency: every 1 hour)
- In-Process Control Check
-
Time
-
Cut Off on Ink Mark
-
Left Side Coverage
-
Right Side Coverage
-
Seam Seal Quality
-
Height of Media Against Faceguard
-
Assembly Appearance
-
Sufficient Seam Seal (Peel Test)
Verified by:
-
Add signature