Title Page

  • Site conducted

  • Work Order No.

  • Conducted on

  • Operator Name

  • Drawing Reference

  • Media Part No.

First Run Off Inspection (every start up, model change over or shift change)

Media Roll

  • Media Roll Number

  • Pleat Count

  • Pleat Style

  • Pleat Height (mm)

  • Pleat Pack Width (mm)

  • Pleat Lock Spacing (mm)

  • Pleat Lock Width (mm)

  • Post Heat (°C)

  • Pleat Perpendicular to Base?

  • Media Coating Delamination?

  • Light Check/Pin Hole Check

In-Process Control Check (every roll change)

    Media Roll
  • Media Roll Number

  • Pleat Count

  • Pleat Style

  • Pleat Height (mm)

  • Pleat Pack Width (mm)

  • Pleat Lock Spacing (mm)

  • Pleat Lock Width (mm)

  • Post Heat (°C)

  • Pleat Perpendicular to Base?

  • Media Coating Delamination?

  • Light Check/Pin Hole Check

Verified by:

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.