Date and Conductor of Report
Date / Day of the Week:
-
Select date
Leader Conducting Report:
Other Managers / Leaders (In Ranking Order):
General Performance and Maintenance
Highs and Lows: Team / Equipment / Facility etc:
Cleaning / Maintenance Projects Completed:
Training / Role Playing Completed:
Checklist
-
Catering orders reviewed / discussed / hung-up & applicable trays have been prepared:
-
All refrigerated items are covered and have been day-dotted:
All frigs and freezers are at proper temperature:
-
F1:<br>
-
T1:<br>
-
T2:
-
Lowboy 1:<br>
-
Lowboy 2:
-
Lowboy 3:
-
Lowboy 4:
-
Lowboy 5:
-
Lowboy 6:
-
Walk-in Refrigerator:
-
Walk-in Freezer:
-
All frigs and freezers are clean (including gaskets):<br>
-
Fry freezer is full:
-
CLOSING ONLY: All fry circuit breakers are off:
-
Season coater shelf is full:<br>
-
L & T for next shift?
-
No produce cases on floor in walk-in:
-
Breading table area has been changed and is clean:
-
Big and small carts are clean:
-
Breading area sink / lowboys (inside and out) are wiped down:
-
Towel dispenser / soap & sanitizer / window wiped down:
-
All trash cans are clean / trash is taken out:
-
Concrete outside back door and & front dumpster scrubbed clean:
-
All bread racks are outside and properly stacked:
-
Frozen wheat buns have been pulled:
-
All sinks (including mop sink) are clean:
-
There is a sink of clean sanitizer water:
-
All dishes washed including tea urns INSIDE AND OUT:<br>
-
Plenty of buns for next shift:
-
Burners / grills / boards / fry / bun toaster are clean including surrounding areas:
-
ALL cutting boards are clean / bleached (free of mildew) and set vertical to dry:
-
Floors swept and mopped:
-
Mop bucket / mop are clean:
-
All chicken in lowboys is thawed:
-
Pressure fryer baskets have been cleaned and not left in fryer:
-
Nugget chopper cleaned:
-
Open and pressure fryers dropped / cleaned (including behind coils) and are in shape for next shift:
-
Char machine and cart are clean:
-
Chopper / mixer and surrounding areas are clean:
-
6 FULL pans of filleted CFA:
-
2 pans of filleted CG:
-
2 pans of filleted spicy:
-
1 pan of filleted breakfast:
-
ALL pans initialed:
-
4 milkwash in refrigerator:<br>
-
NIGHT SHIFT: All available chicken is de-breaded:<br>
-
CFA fillets have been cooked for CSS: <br>
-
10 - 15 oatmeal packets out and thawing:<br>
-
Salad / wrap chicken, soup, chopped cabbage, chopped romaine all in frig:
-
BREAD: Enough flat, wheat-berry, bagels, minis for next shift (room temperature):
-
Boards area is completely stocked for next shift INCLUDING FRY BOXES:
-
Dumpster area is clean (including behind & in front) and lid is closed:
-
Chicken has been FULLY rotated (thawing cabinet and lowboys are full):
-
Number of coleslaw:
-
Number of chicken salad:
-
Number of salads:
-
Number of wraps:
-
Number of CSS:
-
CLOSING: FRYERS, BURNERS, CG MACHINE, CVAT, OVEN, WARMERS, CHUTES OFF:
-
Sugar bin is full and clean:
-
Coolers are clean and placed in order where they belong:
-
Scale is in place and working:
-
Thermometer is in place and working:
-
Dry storage area is clean (including under racks) & organized (nothing on the floor):<br>
-
Wash and hang-up unsoiled towels (soiled towels are IN towel container):
-
Chicken tracker is completed:
-
Pounds of leftover regular chicken:
-
Pounds of leftover spicy chicken:
-
Adequate amount of cookies baked:
-
Soup pot checked for water / soup:<br>