Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Guide Office Type
-
Natural Ventilation Cellular
-
Natural Ventilation Open Plan
-
Air conditioned Standard
-
Air Conditioned Prestige
Total floor area
-
Total floor area known
-
Is there an EPC available
-
Total floor area estimated
Business Hours
-
Are business hours standard, if no please enter extended hours
Building Fabric
-
Are windows single glazed
-
Are windows double glazed
-
Are windows triple glazed
-
Is there loft insulation
-
Is there cavity insulation
-
Is the building fabric in good condition
HVAC
-
Is there a gas boiler on site<br>Please enter type, model and size if known
-
Is there other forms of gas heating on site, <br>please enter details below
-
Is there air conditioning
-
Does the combined power of the A/C exceed 12kW
-
Is there a TM44 inspection available
-
Are there heating/cooling controls
-
Are all controls set correctly
-
Is HVAC plant in good condition and regularly maintained
Lighting
-
Is there outside floodlighting
-
Is outside lighting adequately controlled
-
Is Florescent lighting used internally
-
Are there T12 tubes
-
Are there T8 tubes
-
Are tubes T5 or CFL
-
Are there tungsten filament lamps
-
Are there halogen lamps
-
Are there LED fittings
-
Does lighting have adequate controls
Utility Information
-
Is there a gas meter on site<br>Please enter number of meters and MPRN if known and reading
-
Are there electricity meters on site<br>Please enter number of meters and MPANs with readings
-
Are the electricity meters HH or AMR
-
Are meters entered on Bam Smart
-
Is energy supply via EDF
-
Is there a water meter on site<br>Please enter number of meters and readings
Prioritised Concerns
-
Are there any prioritised concerns
Recommendations
-
Carry out DEC
-
Install double/secondary glazing
-
Install insulation
-
Repairs to fabric
-
Replace boiler plant
-
Set / replace or install heating controls
-
Repair / maintain A/C plant
-
Carry out TM44 inspection
-
Set / replace or install A/C controls
-
Replace T12 tubes with T8 or T5
-
Replace T8 tubes with T5 or LED
-
Replace tungsten lamps with CFL
-
Replace Halogen lamps with LED
-
Install lighting control
-
Install AMR
-
Register meters on Bam Smart
-
Change supplier to EDF
-
Locate or install water meter
-
Ensure equipment is switched off at night and weekends
-
Fit timers to non essential equipment