Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Business Hours
-
Are business hours standard, if no please enter extended hours
-
Have levels of occupation changed
Heating/Ventilation
-
Do the offices appear to be at a comfortable level
-
Natural Ventilation Cellular
-
Natural Ventilation Open Plan
-
Are the controls adequate
-
Are the time controls and set points correct
-
What is the age and condition of the boilers
-
Air conditioned Standard
-
Does the site have a BMS
-
If air conditioned is it linked to the BMS
-
Are staff responsible for changing controls
-
Are members of staff familiar with the BMS system
-
Is all pipe work fully insulated
Lighting
-
Is there outside floodlighting
-
Is outside lighting adequately controlled
-
Are the lights controlled by sensors
-
Are meeting rooms, single offices controlled by sensors
-
Could LEDs be considered in areas where constant light is required
-
If yes to the above. Are they absents or presents
Utility Information
-
Do washrooms have push taps
-
Do gents urinals have flush controls
-
Is there a gas meter on site<br>Please enter number of meters and MPRN if known and reading:
-
Are there electricity meters on site<br>Please enter number of meters and MPANs with readings:
-
Are the electricity meters HH or AMR:
Prioritised Concerns
-
Are there any prioritised concerns
-
Add signature