Title Page
To be completed by Maintenance technician
-
Factory
-
Asset No
-
Asset description
-
Work report
Work on the above machine has been carried out and the necessary repair/maintenance has been completed. No extraneous engineering debris, equipment or tools have been left on or around the machine. The machine has been left in a clean and tidy condition in preparation for hygiene/sanitation prior to being returned to production.
-
Tap to enter information
-
Signature
To be completed by factory Manager/Supervisor
-
Red - Do not start production until cleaning/sanitation procedure has been completed.<br>Green - Check machine thoroughly and restart production if satisfied machine is clean.
-
Machine has been formally accepted back to production control and cleaning/sanitation procedure will be implemented and carried out as required