Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Receiving Information

  • Enter date and time the item arrived at ZoMazz.

  • Shipping service used

  • Tracking number

Product Information

  • Enter the contents of the package.

  • Item
  • Description:

  • Does the item require an engineering inspection confirmation?

  • Is the engineering drawing for the item in our database or is it available?

  • Part number

  • Revision number

Engineering Design

  • Matches form tool shape?

  • Graphic registration?

  • Surface finish correct? (Exterior)

  • Surface finish correct? (Interior)

  • Does the part geometry match the CAD drawing?

  • Is material thickness accurate as specified?

  • Multi-cavity: all cavities checked?

  • Strength tested?

  • Rev A released?

  • Assembly functions as intended?

  • Assembly docs released?

Graphic design

  • Aesthetics match intent?

  • Color thinning?

  • Colors confirmed by graphics?

  • Gold standard approved?

Forming design

  • Trim quality?

  • Forming consistency?

  • Trimming approved?

  • Singulation checked?

  • Other process issues: splay, blush, short shots, etc.

Production design

  • Assembly procedure released?

  • Production plan confirmed?

  • Testing

Inspection finalization

  • Vendor notified of defects or inconsistencies?

  • Notes:

  • Final action taken:

  • Receiving officer

  • Select date

  • Engineering inspector

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.