Title Page
-
EF PS 001
-
Conducted on
-
Inspection Carried Out By
-
Vessel Name?
-
Vessel Departure
-
Steverdore
- C3
- LSS
-
What Berth?
- No 2 East
- No 2 West
- No 3 East
- No 7 East
- No 7 West
- CQ 2
- Other
- No 3 West
-
Product that was transferred?
- Logs
- PKE
- Urea
- Fertiliser
- Other
- Gypsum
-
Has the wharf been swept following load out completion?
-
All bulk cargo product removed from wharf? <br>
-
All bulk product removed from slot drains on wharf? <br>
-
Hoppers dry swept and removed from wharf? <br>
-
Is there any evidence of spills or leaks of oils/fuels on wharf resulting from load out?
-
Load out equipment such as diggers/grab removed from wharf?
-
Is there waste material associated with the load out been remaining on the wharf?
-
Any other issues identified during inspection:
-
Are there any follow actions needed?
-
Follow up action to be completed by:
-
Who is responsible for follow up actions?
-
Wharf photo
-
This report emailed to the following:
- Tony S
- C3
- Kim K
- Brigid C
- LSS
- Tristan W
- Other
-
Inspection carried out by:
-
Signature of Person undertaking inspection