Information

  • Document No.

  • Location Name:

  • Business Unit Number:

  • Location
  • Telephone Number:

  • Fax Number:

  • General Manager:

  • Operations Manager:

  • Local Safety Officer:

  • Conducted on

  • Prepared by

  • Personnel

Facility Function:

  • Describe Site Use:

  • Is this facility shared with another company?

  • If shared, what is the name if the business?

  • What is the nature of this their business?

  • Does EMSC own or lease this facility?

  • How long has AMR been on site?

  • If leased, is a copy of the lease documented on site?

  • Lease renewal date?

Uninterrupted Power Supply / Generators

  • Does this site have a UPS?

  • Back-up battery system?<br>(If yes, see battery tab)

  • Does this site have a back up generator?

  • Generator fuel type:

  • Does generator require any local license or certificate?

Site Walk and General Housekeeping

  • 1. Is the maintenance shop clean and tidy?

  • 2. Are spills cleaned up promptly?

  • 3. Is there an adequate supply of clean absorbent?

  • 4. Is the Environmental policy posted on the wall in a general access area?

  • 5. Are there any hazardous, regulated, or banned wastes in the garbage?

  • 6. Is the facility fenced?

  • 7. Are there scrap vehicle parts, tanks, drums, etc dumped on property?

  • 8. Is litter controlled on property?

  • 9. Are there any drains emptying into ditches surrounding the property?

  • 10. Are the drains clear of rubbish and debris?

  • 11. Are there signs of oil or petroleum discharge around drains?

  • 12. Is there evidence of any of the following on site?

  • 12.1 Oil Staining?

  • 12.2 Stressed Vegetation?

  • 12.3 Strong Odors?

  • 13. Is the site under snow cover at time of site walk?

  • 14. Are dumpsters closed or covered?

  • Action Required:

Underground Storage Tanks

  • Are underground storage tanks used at this site?

  • Tank 1:

  • Material of construction:

  • Tank is:

  • Capacity in Gallons:

  • Tank contents:

  • The tank contents are:

  • Does tank have Cathodic Protection?

  • Has Cathodic protection been tested in past 3 years?

  • Does tank have interstitial monitoring?<br>(Double wall only)

  • Is there a monitoring well? (Some states require ground well sensors)

  • Is there is a well, is there monitoring data?

  • Does tank have spill containment?

  • Does tank have overfill protection?

  • Pipe is:

  • Pipe construction material:

  • Pipe wall is:

  • Does pressurized pipe have leak detection?

  • Are daily inventory records okay?

  • Are monthly reconciliation okay?

  • Does tank have Auto Gauging?

  • Is dipstick in good condition?

  • Date tank was last tested:

  • Is tank tight? (Should be every year, required by law at least every 3 years)

  • Is a permit required for tank?

  • If yes, is tank permitted?

  • Is permit posted near tank?

  • Is tank in compliance?

  • Action Required:

  • Tank 2:

  • Material of construction:

  • Tank is:

  • Capacity in Gallons:

  • Tank contents:

  • The tank contents are:

  • Does tank have Cathodic Protection?

  • Has Cathodic protection been tested in past 3 years?

  • Does tank have interstitial monitoring?<br>(Double wall only)

  • Is there a monitoring well? (Some states require ground well sensors)

  • Is there is a well, is there monitoring data?

  • Does tank have spill containment?

  • Does tank have overfill protection?

  • Pipe is:

  • Pipe construction material:

  • Pipe wall is:

  • Does pressurized pipe have leak detection?

  • Are daily inventory records okay?

  • Are monthly reconciliation okay?

  • Does tank have Auto Gauging?

  • Is dipstick in good condition?

  • Date tank was last tested:

  • Is tank tight? (Should be every year, required by law at least every 3 years)

  • Is a permit required for tank?

  • If yes, is tank permitted?

  • Is permit posted near tank?

  • Is tank in compliance?

  • Is permit posted near tank?

  • Is tank in compliance?

  • Action Required:

  • Tank 3:

  • Material of construction:

  • Tank is:

  • Capacity in Gallons:

  • Tank contents:

  • The tank contents are:

  • Does tank have Cathodic Protection?

  • Has Cathodic protection been tested in past 3 years?

  • Does tank have interstitial monitoring?<br>(Double wall only)

  • Is there a monitoring well? (Some states require ground well sensors)

  • Is there is a well, is there monitoring data?

  • Does tank have spill containment?

  • Does tank have overfill protection?

  • Pipe is:

  • Pipe construction material:

  • Pipe wall is:

  • Does pressurized pipe have leak detection?

  • Are daily inventory records okay?

  • Are monthly reconciliation okay?

  • Does tank have Auto Gauging?

  • Is dipstick in good condition?

  • Date tank was last tested:

  • Is tank tight? (Should be every year, required by law at least every 3 years)

  • Is a permit required for tank?

  • If yes, is tank permitted?

  • Is permit posted near tank?

  • Is tank in compliance?

  • Is permit posted near tank?

  • Is tank in compliance?

  • Action Required:

  • Tank 4:

  • Material of construction:

  • Tank is:

  • Capacity in Gallons:

  • Tank contents:

  • The tank contents are:

  • Does tank have Cathodic Protection?

  • Has Cathodic protection been tested in past 3 years?

  • Does tank have interstitial monitoring?<br>(Double wall only)

  • Is there a monitoring well? (Some states require ground well sensors)

  • Is there is a well, is there monitoring data?

  • Does tank have spill containment?

  • Does tank have overfill protection?

  • Pipe is:

  • Pipe construction material:

  • Pipe wall is:

  • Does pressurized pipe have leak detection?

  • Are daily inventory records okay?

  • Are monthly reconciliation okay?

  • Does tank have Auto Gauging?

  • Is dipstick in good condition?

  • Date tank was last tested:

  • Is tank tight? (Should be every year, required by law at least every 3 years)

  • Is a permit required for tank?

  • If yes, is tank permitted?

  • Is permit posted near tank?

  • Is tank in compliance?

  • Is permit posted near tank?

  • Is tank in compliance?

  • Action Required:

  • Action Required:

Above Ground Storage Tanks:

  • Tank 1:

  • Tank capacity in gallons:

  • Tank contents:

  • Is tank labeled correctly?

  • Year of construction:

  • Location:

  • Tank configuration:

  • Cube:

  • Vertical

  • Horizontal

  • Drum:

  • Vertical

  • Horizontal

  • Is permit required for tank?

  • If yes, is tank permitted?

  • Is tank in compliance with local, state, and federal regulations as well as AMR Policy?

  • Is tank skid mounted?

  • Does tank have rain protection?

  • Is outdoor AST electrically grounded?

  • Does tank have automatic inventory controls?

  • Does tank have overfill protection at dispensing point?

  • Does tank have spill containment?

  • Is tank double wall construction?<br>(Is yes skip dike)

  • Is tank diked?

  • Dike floor construction:

  • Is dike drain closed?

  • Is dike empty?

  • Is there more than 1320 gallons of total Petro products stored in above ground tanks?<br>(If yes, need to comply with Sarah Tier II requirements)

  • If yes, is a spill Control & Countermeasure plan required? <br>(Only is petroleum exceeds 1320 gallons, and stored outdoors)

  • If SPCC plan required, is there a written plan in place?

  • Has plan been certified by management / signed by GM?

  • Certified by professional engineer?

  • Notification / Emergency contact list?

  • Inspection report on file?

  • Significant changes to SPCC plan?

  • Spill greater than 10 gallons within last year?

  • If plan has been implemented for more than 3 years, has the last review been done within the past 3 years?

  • Is the facility in compliance with the SPCC plan?

  • Action Required:

  • Tank 2:

  • Tank capacity in gallons:

  • Tank contents:

  • Is tank labeled correctly?

  • Year of construction:

  • Location:

  • Tank configuration:

  • Cube:

  • Vertical

  • Horizontal

  • Drum:

  • Vertical

  • Horizontal

  • Is permit required for tank?

  • If yes, is tank permitted?

  • Is tank in compliance with local, state, and federal regulations as well as AMR Policy?

  • Is tank skid mounted?

  • Does tank have rain protection?

  • Is outdoor AST electrically grounded?

  • Does tank have automatic inventory controls?

  • Does tank have overfill protection at dispensing point?

  • Does tank have spill containment?

  • Is tank double wall construction?<br>(Is yes skip dike)

  • Is tank diked?

  • Dike floor construction:

  • Is dike drain closed?

  • Is dike empty?

  • Is there more than 1320 gallons of total Petro products stored in above ground tanks?<br>(If yes, need to comply with Sarah Tier II requirements)

  • If yes, is a spill Control & Countermeasure plan required? <br>(Only is petroleum exceeds 1320 gallons, and stored outdoors)

  • If SPCC plan required, is there a written plan in place?

  • Has plan been certified by management / signed by GM?

  • Certified by professional engineer?

  • Notification / Emergency contact list?

  • Inspection report on file?

  • Significant changes to SPCC plan?

  • Spill greater than 10 gallons within last year?

  • If plan has been implemented for more than 3 years, has the last review been done within the past 3 years?

  • Is the facility in compliance with the SPCC plan?

  • Action Required:

  • Tank 3:

  • Tank capacity in gallons:

  • Tank contents:

  • Is tank labeled correctly?

  • Year of construction:

  • Location:

  • Tank configuration:

  • Cube:

  • Vertical

  • Horizontal

  • Drum:

  • Vertical

  • Horizontal

  • Is permit required for tank?

  • If yes, is tank permitted?

  • Is tank in compliance with local, state, and federal regulations as well as AMR Policy?

  • Is tank skid mounted?

  • Does tank have rain protection?

  • Is outdoor AST electrically grounded?

  • Does tank have automatic inventory controls?

  • Does tank have overfill protection at dispensing point?

  • Does tank have spill containment?

  • Is tank double wall construction?<br>(Is yes skip dike)

  • Is tank diked?

  • Dike floor construction:

  • Is dike drain closed?

  • Is dike empty?

  • Is there more than 1320 gallons of total Petro products stored in above ground tanks?<br>(If yes, need to comply with Sarah Tier II requirements)

  • If yes, is a spill Control & Countermeasure plan required? <br>(Only is petroleum exceeds 1320 gallons, and stored outdoors)

  • If SPCC plan required, is there a written plan in place?

  • Has plan been certified by management / signed by GM?

  • Certified by professional engineer?

  • Notification / Emergency contact list?

  • Inspection report on file?

  • Significant changes to SPCC plan?

  • Spill greater than 10 gallons within last year?

  • If plan has been implemented for more than 3 years, has the last review been done within the past 3 years?

  • Is the facility in compliance with the SPCC plan?

  • Action Required:

  • Tank 4:

  • Tank capacity in gallons:

  • Tank contents:

  • Is tank labeled correctly?

  • Year of construction:

  • Location:

  • Tank configuration:

  • Cube:

  • Vertical

  • Horizontal

  • Drum:

  • Vertical

  • Horizontal

  • Is permit required for tank?

  • If yes, is tank permitted?

  • Is tank in compliance with local, state, and federal regulations as well as AMR Policy?

  • Is tank skid mounted?

  • Does tank have rain protection?

  • Is outdoor AST electrically grounded?

  • Does tank have automatic inventory controls?

  • Does tank have overfill protection at dispensing point?

  • Does tank have spill containment?

  • Is tank double wall construction?<br>(Is yes skip dike)

  • Is tank diked?

  • Dike floor construction:

  • Is dike drain closed?

  • Is dike empty?

  • Is there more than 1320 gallons of total Petro products stored in above ground tanks?<br>(If yes, need to comply with Sarah Tier II requirements)

  • If yes, is a spill Control & Countermeasure plan required? <br>(Only is petroleum exceeds 1320 gallons, and stored outdoors)

  • If SPCC plan required, is there a written plan in place?

  • Has plan been certified by management / signed by GM?

  • Certified by professional engineer?

  • Notification / Emergency contact list?

  • Inspection report on file?

  • Significant changes to SPCC plan?

  • Spill greater than 10 gallons within last year?

  • If plan has been implemented for more than 3 years, has the last review been done within the past 3 years?

  • Is the facility in compliance with the SPCC plan?

  • Action Required:

  • Tank 5:

  • Tank capacity in gallons:

  • Tank contents:

  • Is tank labeled correctly?

  • Year of construction:

  • Location:

  • Tank configuration:

  • Cube:

  • Vertical

  • Horizontal

  • Drum:

  • Vertical

  • Horizontal

  • Is permit required for tank?

  • If yes, is tank permitted?

  • Is tank in compliance with local, state, and federal regulations as well as AMR Policy?

  • Is tank skid mounted?

  • Does tank have rain protection?

  • Is outdoor AST electrically grounded?

  • Does tank have automatic inventory controls?

  • Does tank have overfill protection at dispensing point?

  • Does tank have spill containment?

  • Is tank double wall construction?<br>(Is yes skip dike)

  • Is tank diked?

  • Dike floor construction:

  • Is dike drain closed?

  • Is dike empty?

  • Is there more than 1320 gallons of total Petro products stored in above ground tanks?<br>(If yes, need to comply with Sarah Tier II requirements)

  • If yes, is a spill Control & Countermeasure plan required? <br>(Only is petroleum exceeds 1320 gallons, and stored outdoors)

  • If SPCC plan required, is there a written plan in place?

  • Has plan been certified by management / signed by GM?

  • Certified by professional engineer?

  • Notification / Emergency contact list?

  • Inspection report on file?

  • Significant changes to SPCC plan?

  • Spill greater than 10 gallons within last year?

  • If plan has been implemented for more than 3 years, has the last review been done within the past 3 years?

  • Is the facility in compliance with the SPCC plan?

  • Action Required:

  • Tank 6:

  • Tank capacity in gallons:

  • Tank contents:

  • Is tank labeled correctly?

  • Year of construction:

  • Location:

  • Tank configuration:

  • Cube:

  • Vertical

  • Horizontal

  • Drum:

  • Vertical

  • Horizontal

  • Is permit required for tank?

  • If yes, is tank permitted?

  • Is tank in compliance with local, state, and federal regulations as well as AMR Policy?

  • Is tank skid mounted?

  • Does tank have rain protection?

  • Is outdoor AST electrically grounded?

  • Does tank have automatic inventory controls?

  • Does tank have overfill protection at dispensing point?

  • Does tank have spill containment?

  • Is tank double wall construction?<br>(Is yes skip dike)

  • Is tank diked?

  • Dike floor construction:

  • Is dike drain closed?

  • Is dike empty?

  • Is there more than 1320 gallons of total Petro products stored in above ground tanks?<br>(If yes, need to comply with Sarah Tier II requirements)

  • If yes, is a spill Control & Countermeasure plan required? <br>(Only is petroleum exceeds 1320 gallons, and stored outdoors)

  • If SPCC plan required, is there a written plan in place?

  • Has plan been certified by management / signed by GM?

  • Certified by professional engineer?

  • Notification / Emergency contact list?

  • Inspection report on file?

  • Significant changes to SPCC plan?

  • Spill greater than 10 gallons within last year?

  • If plan has been implemented for more than 3 years, has the last review been done within the past 3 years?

  • Is the facility in compliance with the SPCC plan?

  • Action Required:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.