Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Is there a copy of the approved EMP with the works crew ?
-
Are EMP controls in accordance with the approved plan ?
-
Do noise levels onsite comply with regulations (unlikely to cause nuisance to nearby receptors) ?
-
Are the controls in place sufficient to prevent the generation of dust ?
-
Are the controls in place sufficient to prevent sediment laden run off from leaving the site ?
-
Are sediment controls installed correctly and are they being maintained ?
-
Are roads providing access to the site free from mud and debris ?
-
Are open drainage trenches free from obstruction and lined to prevent erosion ?
-
Is all waste generated onsite by the works being correctly stored and disposed of ?
-
Are chemicals being stored in an appropriate location to prevent/contain spills ?
-
Is the machinery onsite in good working order (not leaking any oils or hydraulic fluid) ?
-
Have environmentally sensitive areas been fenced off (no go zones) ?
-
Have areas of aboriginal heritage significance been protected in accordance with the CHMP ?
-
Are the activities onsite appropriate for the weather conditions ?
-
Describe any remedial works required to be performed by the contractor as a result of this audit