Title Page
-
Environmental Inspection ISO14001: 2014
-
Client / Site
-
Add location
-
Conducted on
-
Prepared by:
- Ibti Ashby
- Leigh Phillips
- Chris Hallam
- Ron Hodgson
- Carl Bentley
- Marian O'Donnall
- Jay Haxell
- Andy Stanford
- Brian Sorohan
- Jordan Wells
- Lewis Batchford
- James Hiom0
-
Site representative participating in inspection:
For current legislation that applies to this inspection, please refer to Erith Group's Legal Register. A copy can be provided on request.
-
Inspection Number: (project code followed by / followed by full date, i.e. 6542/13102016)
Site or Project details:
-
Who is the Client:
-
What type of project is this? (Select all that applies)
- Remediation
- Demolition
- Infrustructure
- Asbestos / Hazi
- Primary Contractor
- Sub-contractor
-
Project number (Record "NIL" if no project number exists)
Pre Inspection
-
Have you been given a site specific induction that relates to environmental risks?
- Yes
- Observation
- Partially
- No
-
Has there been a prior audit or inspection carried out on this project?
-
Have any actions or observations been closed out where applicable?
- Yes
- Observation
- Partially
- No
-
Have these changes, where applicable, been maintained?
- Yes
- Observation
- Partially
- No
Permits and Authorisations
-
Are sections 60/61/80 F10 and all other authorisations on file / on display?
- Yes
- Observation
- Partially
- No
-
Does the site require a crusher or screener permit?
- Yes
- No
-
Does the project have disposal site permits for all disposal sites it uses on file / on EZone?
- Yes
- Observation
- Partially
- No
-
Photos
-
Notes:
Project Management
-
Does the project look clean, managed and well organised?
- Yes
- Observation
- Partially
- No
-
Is all surface accumulation and use of water being managed?
- Yes
- Observation
- Partially
- No
-
Are spill kits kept near drains and COSHH storage areas?
- Yes
- Observation
- Partially
- No
-
Are spill kits dry, unused and complete?
- Yes
- Observation
- Partially
- No
-
Is there evidence of staff undertaking emergency drill training (fire, spillage, etc.) or is there evidence of this training been carried out on prior projects within the last 6 months?
- Yes
- Observation
- Partially
- No
-
Is there a requirement for Client based training or our input into Client systems for project staff?
- Yes
- Observation
- Partially
- No
-
Are the project-specific environmental aspects on display and trained out?
- Yes
- Observation
- Partially
- No
-
Have all staff been briefed on the Environmental Management Plan and other risks for the project?
- Yes
- Observation
- Partially
- No
-
Have all services been identified and planned on a project plan?
- Yes
- Observation
- Partially
- No
-
Is there evidence of both Contractors signing up to our RAMS and vice versa?
- Yes
- Observation
- Partially
- No
-
Are all items of unused plant and machine switched off when not in use and considered for overnight parking oil leakage?
- Yes
- Observation
- Partially
- No
-
Are hoses and pipes checked in any inspections carried out on site?
- Yes
- Observation
- Partially
- No
-
Are utility meter readings kept (gas, electricity, water, diesel, plant oil)
- Yes
- Observation
- Partially
- No
-
Photos
-
Notes
Security
-
Is the project fully hoarded / fenced?
- Yes
- Observation
- Partially
- No
-
Can the project be "locked down" in an emergency?
- Yes
- Observation
- Partially
- No
-
Is there CCTV or manned overnight security on the project?
- Yes
- Observation
- Partially
- No
-
Photos
-
Notes
Project Emissions
-
Is there a system in place to control dust both on and off of project?
- Yes
- Observation
- Partially
- No
-
Is there evidence that nothing is escaping the boundary?
- Yes
- Observation
- Partially
- No
-
Is there a system in place to stop mud leaving the project?
- Yes
- Observation
- Partially
- No
-
Is there a system to ensure no loads are taken from site in-sheeted?
- Yes
- Observation
- Partially
- No
-
Is monitoring in place for noise, dust and vibration?
- Yes
- Observation
- Partially
- No
-
Photos
-
Notes
Hazardous and Non-hazardous Waste and Materials Management
-
Is there evidence of recycling on the project?
- Yes
- Observation
- Partially
- No
-
Is waste and material segregated by type?
- Yes
- Observation
- Partially
- No
-
Is all waste and material stored securely?
- Yes
- Observation
- Partially
- No
-
Do sample transfer notes meet compliance?<br>(Take photographic evidence)
-
Are rejected loads from the project (where applicable) being recorded and reported correctly?
-
Notes:
-
Is COSHH data available?
- Yes
- Observation
- Partially
- No
-
Notes
-
Is there a spill kit close to these areas?
- Yes
- Observation
- Partially
- No
-
Are there fire extinguishers close to these areas.
- Yes
- Observation
- Partially
- No
-
Have drains that are close to these areas been protected?
- Yes
- Observation
- Partially
- No
-
Notes
-
Is a waste log being kept updated on Ezone?
- Yes
- Observation
- Partially
- No
-
Is there evidence of a Waste Management Plan available for the project?
- Yes
- Observation
- Partially
- No
-
If so, has it been trained out or shared with the Client / Contractor?
- Yes
- Observation
- Partially
- No
-
Is there a Materials Management Plan required for the project?
- Yes, in place and updated
- Yes, in place but in need of update 3 months)
- No, and in opinion, required for the project
- Not currently required at this point
Adjacent to the project
-
Has the project identified a adjacent river, pond, lake or other watercourse to the project?
- Yes
- No
-
Does the project have approval for discharging to the foul sewer?
- Yes
- Observation
- Partially
- No
-
Has a permit been issued by the local water company?
- Yes
- Observation
- Partially
- No
-
What is adjacent to the project?
-
North
-
East
-
South
-
West
-
Has the project engaged with neighbours and local residents?
- Yes
- Observation
- Partially
- No
-
Notes:
-
Have any concerns or complaints (if any) been resolved and recorded?
- Yes
- Observation
- Partially
- No
-
Notes:
Oils / chemicals / COSHH Storage
-
Are all oils stored correctly?
- Yes
- Observation
- Partially
- No
-
Photos
-
Notes
-
Are all chemicals stored correctly?
- Yes
- Observation
- Partially
- No
-
Photos
-
-
Notes
-
Are all COSHH items stored correctly in a locked area?
- Yes
- Observation
- Partially
- No
-
Photos
-
Notes
Ecology
-
Has an ecological survey either been carried out or provided by the Client or PC?
- Yes
- Observation
- Partially
- No
-
Photos
-
Notes
Demonstration of resources and energy management
-
Is there general consideration for management of energy and resources on project
-
Add media
Alerts
-
Is the latest environmental alert on display?
- Yes
- Observation
- Partially
- No
-
Photo
-
Many thanks for your hospitality and time on project today. Your inspection will be forwarded to you in due course. Where actions or observations have been made, please keep the team up-to-date with your progress. If you need any support in the above, please let the E&S Team know. leigh.phillips@erith.com jay.haxell@erith.com 0870-9508800 ***PLEASE NOTE - THIS AUDIT IS INTENDED FOR INTERNAL USE ONLY. PERMISSION NEEDS TO BE SOUGHT IF YOU REQUIRE TO SHARE THIS AUDIT EXTERNALLY ***
-
Inspector
-
Project representative