Information

  • Document No.

  • Client / Site

  • Site Contact

  • Conducted on

  • Prepared by

  • Location

Prior Audit Actions

  • Where applicable, have previous audit actions been completed or adopted?

  • Images relating to this category.

  • Does the site / project have an Energy Champion or a keen, proactive member of staff?

Utility supply to project

  • Electricity?

  • Gas?

  • Site Water?

  • How is this recorded?

  • Where the project is of a longer term, has consideration been given to obtaining mains utility supplies?

  • Where electricity is generated, can the project demonstrate it has deployed the most economic unit possible?

  • Has consideration been given to the use of rain water, grey water or water re-use?

  • Images relating to this catagory

General welfare, project detail and offices

  • is the recording and review of utility use effective?

  • Is it a contract requirement to provide meter readings for utilities?

  • Are there any "turn off when not in use" or similar stickers applied to light switches and electrical appliances?

  • Is there any energy saving posters in the offices and welfare?

  • Has the energy saving initiatives presented in the tender process been reflected on the project?

  • Has there been a toolbox talk or briefing to site staff on steps to save energy?

  • Can site or project staff easily provide ideas for energy or utility savings?

  • Do all temporary or used buildings on the project meeting minimum energy efficiency?

  • Is there a requirement from the Client to record Co2e usage on site?

  • How effective is Co2e being recorded?

  • Is Co2e savings communicated to the site or project team?

  • Are water reducing toilets and urinals fitted?

  • is there any evidence of dripping or running taps (staining the sink, etc)?

  • Are self stopping taps fitted to prevent un-needed water use?

  • Do they work properly?

  • Are toilets limited or dual flush?

  • Is there any evidence of water leaks on the project?

  • Is there evidence of car/van sharing or encouragement to use public transport?

  • How is heating managed in the offices and welfare facilities?

  • How is cooling managed in the offices and welfare facilities?

  • Where provided, is the drying room managed/monitored?

  • Is the door to the drying room kept closed or on an auto-closer?

  • Images relating to this category.

Metering

  • Is there good access to utility meters?

  • Are figures reported from meter readings?

  • Is there any activity in comparing meter readings with the site or project staff?

  • Does meter use correspond with seasons of the year?

Office equipment and tools

  • Is there evidence of office electrical equipment and tools being switched off at the wall plug when not in use?

  • Are battery powered equipment being removed from charging when fully charged?

  • Can the electrical equipment be controlled by mains timers?

  • Is there evidence that staff and line managers utilise technology to prevent travel to meetings, etc?<br>(Yammer, email, telephone conferencing, Lync)

  • Is there evidence of mobile equipment being over-charged (i.e. phone left on charge after being fully charged)?<br>

  • Is there evidence of recycling in printer cartridges, paper,etc?

  • Have all electrical goods been portable appliance tested?

  • Can project staff easily recycle?

  • Images relating to this category

  • Has there been any re-use of office furniture, etc?

Heating and Cooling

  • Is there movement activated lighting fitted to office and welfare facilities?

  • What bulbs are being used in the office and welfare facilities?

  • Are all external doors fitted with an auto-closer to prevent heat / cooling escape?

  • Where tools and equipment are rechargeable, is there any evidence of over-charging?

  • Are site refrigerators not overfilled and clean?

  • Images relating to this category

Cold and hot WELFARE water supply

  • How is hot water supplied?

  • How is cold water supplied?

  • How is drinking / potable water supplied?

  • If the project is over three months, has consideration been given to mains filtered drinking water supply?

  • Does the project / site use re-useable cups, glasses and cutlery?

  • Images relating to this category.

SITE water supplies

  • Has the use of grey water or rain water been considered?

  • Is there a consideration to re-direct used mains water for re-use?

  • Are site water hoses checked regularly for leakage?

  • Where possible, are rechargeable power sources utilised for power tools and equipment?

  • All portable tools, leads etc have valid PAT certificate?

  • is the external site lighting managed effectively to prevent wasted energy?

  • Is there a habitual consideration to find other uses for redundant material or equipment?

  • Images relating to this category

PPE and work equipment

  • Is there a consideration to re-use PPE where practicable.

  • Is there any consideration for cleaning of PPE?

  • Is there any evidence of PPE wastage around the project?

  • Is old and worn out PPE inspected prior to new PPE being issued?

  • Is there evidence that deliveries in and loads out are fully utilised to enjoy further energy savings?

Plant, machinery and travel

  • Are all engines switched off when not in use?

  • Have we selected energy efficient plant and machines for this project?

  • From observations, are we using too small a machine to carry out the task causing over-revving.

  • Are the operators switching off the engine of the plant or machine when not being used?

  • Is there in place, a system to identify and address unexpected high fuel usage on machines and plant?

  • Are loads in and out of the project fully utilised to reduce journeys?

  • Is the project aware of the initiatives engaged by our haulage vision with regards to energy saving fleet technology?

  • Are all vehicle fuel usages reviewed and summarised?

  • Has car share been considered for staff travel?

  • Has cycle to work schemes been considered?

  • Are any incentives being offered to staff that car share, cycle or walk to / from work?

  • Is there a consideration for alternative energy lighting and electricity generation?

MEWPS and other electrically powered plant

  • All MEWPS and other electrically / hybrid powered plant have valid inspection certificates?

  • Pre use checks being completed?

  • Operatives suitably trained?

  • Where applicable, are chargers switched off when not in use?

Hoarding and fencing lighting

  • Is external public lighting on hoarding managed?

  • Is the lighting on timers to prevent wastage in daylight hours?

Site security

  • Where provided, have site security been briefed on energy saving?

  • Can site security and staff provide further ideas for energy saving?

  • Does security / Cleaners have a brief with regards to office and yard lighting?

General Observations

  • General observations noted?

Energy Management Score

  • Taking data from this audit, the project will be scored in line with recognised energy efficiency scores, A+ being the most positive score and C being the lowest. All projects need to play their part in reducing energy usage. This is vital to the Client's and our sustainability in business as well as actively participating in reducing our carbon footprint. Please use this audit as a list of improvements. No non-conformances will be recorded. should you have further questions or require assistance, do not hesitate to let us know.

  • From the information provided above, we have scored the project as:

  • Energy Saving Recommendations:

Audit acceptance

  • Audit issued to (name):

  • Auditor

  • Select date

  • Many thanks for participating in today's audit.
    The bulk of this audit has been put together from a number of customer expectations on other projects. Hence, the majority of the findings within will be applicable to your own Client's requirements.
    Please use this as a tool to provide better energy reduction on this project.
    However, should you have any further questions regarding this audit, please do not hesitate to contact the Environment and Sustainability Team.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.