Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
SYSTEM
EMS Implementation
-
Is there a construction environmental management plan (CEMP) on site?
-
Has the CEMP been signed by the project manager?
-
Has the CEMP been fully implemented and relevant forms filled out?
-
Is there an Environmental policy displayed on site?
-
Is the Erosion and Sediment Control Plan displayed on site?
Inductions
-
Has the site specific induction been updated to include environmental?
-
Have the environmental risks for the project been identified?
SITE
Initial Site Inspection
-
Has the ESCP approved for the site?
-
Have all necessary development approvals been obtained?
-
Are site conditions consistent with those assumed within the approved ESCP?
Environmental Forms
-
Are the following environmental forms being filled out at appropriate times and intervals?
-
Weekly environmental inspection checklists
-
Daily environmental conditions
-
Water quality monitoring form
-
Dust monitoring
-
Noise monitoring
Site Establishment
-
Site access is controlled and number of access points minimised?
-
Adequate drainage and sediment controls exist at site entry/ exit points?
-
Adequate drainage, erosion and sediment controls have been placed around the site compound?
-
Office compound area and car park gravelled/ stabilised where necessary to control erosion and mud generation?
-
Appropriate drainage and sediment controls are installed prior to new areas being cleared or disturbed?
-
Is there a rain gauge on site?
Site and Vegetation Management
-
ESC measures have been installed in accordance with the approved installation sequence?
-
Adequate supplies of ESC materials stored on site: such as straw bales, wire, stakes, sediment fence fabric, filter cloth, flocculant etc?
-
Are temporary access roads are stabilised where appropriate?
-
Permanent access roads programmed to be sealed as soon as reasonable and practical?
-
Sediment deposition is not observed on external roads?
-
Site is adequately prepared for the anticipated weather?
-
Adequate protection provided for non disturbance areas, buffer zones, protected trees?
Material and Waste Management
-
Chemical and petroleum products appropriately stored on site?
-
Emergency spill response plan has been prepared for the site?
-
Oil/petroleum spill containment/ response kits available on site where appropriate?
-
Is the site clean and clear of litter build up?
-
Is there separate waste and recycling bin on site?
-
Is waste water from construction activities being captured on site and treated appropriately?
Stockpiles
-
Topsoil with a 100-300mm layer?
-
Are stockpiles 20 meters away from water bodies?
-
Are stockpiles stabilised 70% cover with vegetation or geo textile fabric?
-
Is there a sediment fence at the base of all stockpiles- not too close that it will over flow with sediment?
-
Are the stockpiles positioned in a way that they are away from existing flow paths?
-
If stockpile is not being used within 10 days it is to be stabilised (Hydromulch, Geofabric, or mulch?)
Drainage Controls
-
Are drainage control measures consistent with site ESCP?
-
Is clean and dirty water separated?
-
Have appropriate drainage controls been installed prior to new areas being cleared or disturbed?
Clean Water Drains
-
Are all drains in working order and are adequately maintained?
-
Is upslope clean water being appropriately diverted around/ through the site in a non erosive manner?
-
Does clean water drainage path lead to clean water?
-
Up-slope storm water adequately diverted/ managed?
-
Flow diversion channels/banks stabilised against erosion?
Dirty Water Drains
-
Drains are in working order and are adequately maintained?
-
Drainage lines free of scour and soil deposition?
-
Does dirty water path lead to sediment basin?
-
Flow not unlawfully discharged into an adjacent property?
-
Spacing of cross drainage (e.g catch drains or flow diversion banks) down long slopes is sufficient to prevent rill erosion?
-
Is sediment laden water filtering through sediment traps?
Rock Filter Dams
-
Excessive sediment removed from upslope of all traps?
-
Is flow passing over the dams and not around them?
-
Is the filtration systems free from sediment blockage?
-
Is the rock size appropriate for drain size and flow type?
Erosion Controls
-
Erosion control standard is consistent with requirements of regulatory authority?
-
Soil erosion is being controlled to a standard consistent with the level of environmental risk?
-
Earth batters free of rill erosion?
-
Erosion control measures consistent with the approved ESCP?
-
All erosion controls in working order?
-
Are all erosion control blankets:<br>- Well anchored?<br>- Overlapped in direction of storm water flow?<br>- Not damaged?
-
Mulch has appropriate cover over surface and is working effectively?
-
Is mulch secure and free from movement by wind or water?
Sediment Controls
-
Sediment control standard is consistent with requirements of regulatory authority?
-
Sedimentation is being controlled to a standard consistent with the level of environmental risk?
-
Sediment control is appropriate for the soil type?
-
Sediment control measures are being adequately maintained in proper working order at all times?
Entry / Exit Points
-
Control measures are constructed to appropriate standards?
-
Is rock large enough to not get carried away with vehicles?
-
If shaker grid is installed, is road before and after stabilised with rock for 15 meters?
-
Are entry/ exit pads free of excessive sediment deposition?
-
Excessive sedimentation is not evident on roadway?
Sediment Fences
-
Is bottom of fabric securely buried?
-
Is fabric appropriately overlapped at joints?
-
Is fabric attached to posts?
-
Are sediment fences free of excessive sediment deposition?
-
Are support posts at correct spacing (2m or 3m with backing)?
-
Are sediment fences free of damage?
Sediment Basins
-
Does the basin geometry and layout match design details?
-
Are sediment basins on site flagged off and out of way of public?
-
Is basin adequately sized and calculated to hold run off for the area?
-
Is dewatering being conducted in accordance with best practice?
-
Has excessive sediment been removed from basin?
-
Has a sediment depth marker been installed and maintained?
-
Is the primary outlet structure free from sediment blockage?
-
Is the inlet and outlet appropriately stabilised with rock?
-
Is the settled sediment layer clearly visible through ponded water prior to discharge such water?
-
Do adequate quantities of flocculant (if required) exist on site?
Air Quality
-
Are water trucks on site to control dust and watering down regularly?
-
Are all exposed areas stabilised where possible to minimise dust?
-
On visual inspection, is dust leaving site?
-
Is refuelling occurring as per EMP?
-
Is correct storage of Hazardous materials evident as per EMP?
-
Has there been any dust complaints in the current month? If so, have they been documented and reported to the environmental team?
Noise Control
-
Are times of operation being adhered to and if noisy operation is to occur outside of work hours, nearby residents and the local council are notified?
-
Have all noise levels been adhered to? If a complaint has been made, has it been documented and reported to the environment team?
Water Quality Management
-
Is all water being released off site within the required water quality parameters?
-
Is sediment basin water being documented on EMS-05-12 sediment basin discharging form?
-
If water quality monitoring has been specified as required for the job, is it being undertaken at the correct intervals?
Site Establishment/ Vegetation
-
Is there a site stabilisation plan for the site?
-
Are finished exposed areas being stabilised as soon as works are complete?
-
Are soil surfaces being roughened prior to revegetation?
-
Is erosion being adequately controlled during plant establishment stage?
Flora and Fauna
-
Is vegetation to be cleared been surveyed and adequately marked?
-
If there is protected vegetation on site is it clearly marked and site workers made aware?
-
Are all fauna related activities in the management plan?
SITE SPECIFIC
-
Acid sulphate soils
-
Have acid sulphate soils been identified on site? If no skip this section
-
Is there a acid sulphate management plan for the site?
-
Is all water being treated on site and discharged within the required parameters?
-
Is there an adequate amount of lime on site for treatment of soils?
-
Is the lime register being filled out and being kept up to date?
Cultural Heritage
-
Has this site been identified as containing or potentially containing cultural heritage artefacts? If no, skip this section
-
Have all employees undertaken training to be informed about the presence of Cultural Heritage?
-
Have the local tribe members been contacted?
-
Have any artifacts been found?
Worker observation- Select any worker/ subcontractor on site and ask the following
-
Is the worker aware of the Construction Environmental Management Plan?
-
Is the worker aware of the Erosion and Sediment Control Plan?
-
Does the worker know where the environmental policy is located?
-
If there is any site specific environmental requirements is the worker aware of these?
-
Can the worker provide details of items in the site induction?
-
Add signature