Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
EPDM site inspection form
-
Client:Wates
-
Job title: Wembley Park-E01-02
-
Inspector: MPrice
-
Location
-
Block or phase
Requirements
-
Are all relevant drawings available on site
Inspection checklist:
-
Is the EPDM membrane fitted?
-
Has the EPDM membrane been overlapped correctly?
-
Have all joints been sealed correctly?
-
Is EPDM free of bubbles?
-
Is the EPDM membrane free from damage?
Photos of Inspected EPDM
-
Photos of EPDM
Comments
-
Are there any comments?
Signatures
-
Checked on behalf of MPrice
-
Checked on behalf of Wates (deemed accepted if not returned by 1700 2 days after offered by MPrice)