Title Page
-
Site inspected
-
Inspected on
-
Inspected by
-
Location
Control section
-
Controlled by
-
Signature
Approve section
-
Approved by
-
Signature
Checklist
-
Check Installation and location against drawings
- Yes
- No
- N/A
-
Location
-
Check grounding rod is correctly installed according client specification
-
Check earth bonding of metallic parts
-
Check earth Boss/Crimp/Termination are correctly installed
-
Continuity of earthing connections
- Compliant
- Non-Compliant
- N/A
-
Joint resistance in mOHM
-
Is Denso tape applied