Title Page

  • Site inspected

  • Inspected on

  • Inspected by

  • Location

Control section

  • Controlled by

  • Signature

Approve section

  • Approved by

  • Signature

Checklist

  • Trenches checked for location, elevation and dimensions

  • Cable size, type, spacing and bend radius in accordance with drawings

  • Stub-up dimensions and cable protection pipes installed in accordance with drawings

  • Perform insulation resistance test on cable prior to backfilling trench

  • Pipe size, elevation and bend radius in accordance with drawings

  • Verify if cable is free of visual damage

  • Trench backfilled with fine sand to depth of 200mm above largest cable

  • depth

  • Warning Tape installed

  • Trench backfilled to correct elevation and required compaction performed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.