Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Number of pile counted from West
-
Row number
Control section
-
Controlled by
-
Sign please
Approve section
-
Approved by
-
Add signature
Checklist
-
Are the piles well aligned in a straight line
-
Is the distance between piles respected as plan
-
Is the Ram depth as described as in plan
-
Is the pile vertically alligned
-
Is the head of the pile damaged, if yes is it repaired
-
Is there no bending on the pile