Checks
-
SADEF structural drawings and assembly instruction are available on site and understood by installer?
-
Edge (unsheltered) and middle (sheltered) tables distribution is according to the layout plan?
-
Free distance below the lower panel is respected?
-
Immediately after ramming, head of pile (minimum the upper 2cm all around pile) is cleaned, and is repaired with 100 microns of zinc rich paint?
-
For all mutual holes in the connections between SADEF profiles corresponding bolts and nuts have been used?
-
Torque moment on bolts M8, M12 & M16 as specified by SADEF is respected?
-
If prescribed, all washers have been placed?
-
Table alignment is OK? (in longitudinal direction no shadow from one tablet to another?)
-
All parts (marks) on the SADEF structural drawing are mounted?
-
Panel alignment is OK?
-
Clamps sets are assembled following the SADEF clamp set summary (or Assembly Guidelines)?
-
Clamps are placed parallel to the PV panel?
-
Lateral gap between PV panel and clamp is lower than 2mm, and between 2 panels the max. distance is 21mm?