Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
EQUIPMENT DETAILS
-
EQUIPMENT:
- CUSTOMER LIFT
- PASSENGER LIFT
- STAIRLIFT
- STAFF GOODS LIFT
- GOODS ONLY LIFT
- PLATFORM LIFT
- SCISSOR LIFT
- OTHER PLEASE STATE
- DOCK LEVELLER
- SCENIC LIFT
- CAR LIFT
- CONVEYOR
-
EQUIPMENT NUMBER & GENERAL DETAILS
-
DATE OF LAST INSURANCE INSPECTION
-
DETAILS OF ANY INSURANCE ISSUES
-
MAINTENANCE CONTRACTOR
- PICKERINGS LIFTS
- EXPRESS LIFTS
- LSD
- KONE
- ASCENDANT
- SCHINDLER
- OTHER PLEASE STATE
-
DATE OF LAST SERVICE VISIT
-
HAVE MAINTENANCE VISITS BEEN TO SCHEDULE
-
SUMMARY OF CALL OUTS ON LOG CARD
-
IS LG CERTIFICATION ON SITE
-
CONTRACT TYPE
-
REASON FOR AUDIT
MOTOR ROOM
-
IS ACCESS SAFE
-
PHOTO
-
CONDITION OF MAIN GEAR/HYDRAULICS
-
PHOTO
-
CONTROLLER REVIEW
-
PHOTO
-
ANY OTHER COMMENTS
-
PICTURE OF MOTOR ROOM
LIFT CAR
-
OPERATION/CONDITION OF CAR DOORS/GATES
-
PHOTO
-
LIGHTING LEVEL/CONDITION IN CAR
-
DO ALL BUTTONS AND INDICATORS WORK CORRECTLY
-
PHOTO
-
OPERATION OF CAR ALARM
-
CONDITION OF CAR FLOORING
-
PHOTO OF FLOORING
-
GENERAL COMMENTS
-
PICTURE OF LIFT CAR
-
DDA COMPLIANCE
LANDINGS
-
CONDITION OF DOORS/GATES AT BASEMENT LEVEL
-
CONDITION OF DOORS/GATES AT GROUND FLOOR
-
CONDITION OF DOORS/GATES AT FIRST FLOOR
-
CONDITION OF DOORS/GATES AT SECOND FLOOR
-
CONDITION OF DOORS/GATES AT THIRD FLOOR
-
CONDITION OF DOORS/GATES AT FOURTH FLOOR
-
CONDITION OF DOORS/GATES AT ALL OTHER FLOORS
-
DO ALL BUTTONS AND INDICATORS WORK CORRECTLY
-
PHOTO DOOR/GATE ISSUES
-
LANDING INDICATORS
-
CONDITION OF LOCKS AND ASSOCIATED EQUIPMENT( RAMPS, CATCHES, SWITCHES)
-
PHOTO
-
GENERAL COMMENTS/ENTRANCE SIZE
-
PICTURE OF ANY LANDING ISSUES
LIFT SHAFT
-
ANY H&S ISSUES ASSOCIATED WITH PIT (LADDER, PIT SWITCH, SHALLOW PIT, ETC)
-
CAR TOP CONTROL/CAR TOP ACCESS
-
ANY HAZARDS IN SHAFT
-
SHAFT LIGHTING
-
GENERAL COMMENTS
-
PICTURE OF ANY SHAFT ISSUES
OPERATIONAL REVIEW
-
HOW DOES LIFT OPERATE
-
HAVE INSURANCE ITEMS BEEN ACTIONED IN TIMELY MANNER
-
ANY LEVELLING ISSUES
-
PATIENT CARE ISSUES
-
PHOTO
-
RESPONSE TO CALL OUTS
-
ANY HEALTH & SAFETY ISSUES THAT NEED ADDRESSING
-
PHOTO
-
TIMESCALES FOR RESOLUTION OF HEATH & SAFETY ISSUES
- IMMEDIATE
- 1WEEK
- 1 MONTH
- 3MONTHS
- 6 MONTHS
- WITHIN 12 MONTHS
- WHEN LIFT IS REFURBISHED
-
IMPROVEMENTS/ACTIONS REQUIRED
-
PHOTO
-
TIMESCALES FOR RESOLUTION OF GENERAL ITEMS (LOW RISK)
- IMMEDIATE
- 1WEEK
- 1 MONTH
- 3MONTHS
- 6 MONTHS
- WITHIN 12 MONTHS
- WHEN LIFT IS REFURBISHED
MAINTENANCE CONTRACTOR REVIEW
-
PERFORMANCE OF CONTRACTOR (CLIENT OPINION - ADDITIONAL COMMENTS)
EQUIPMENT OVERALL REVIEW BY SCORE
-
RECOMMENDATION FOR REFURBISHMENT (INCLUSION IN CAPITAL WORKS PROGRAMME)
- IMMEDIATELY
- 1 YEAR
- 2 YEARS
- 3YEARS
- 5 YEARS
- 7 YEARS
- 10 YEARS
- 10 YEARS PLUS
-
LIFE EXPECTANCY OF EQUIPMENT BEFORE REFURBISHMENT/REPLACEMENT
-
HAS ANY MONEY BEEN SPENT ON EQUIPMENT IN LAST 12 MONTHS
- NONE
- COMPREHENSIVE CONTRACT
- UP TO £1,000
- UP TO £5,000
- UP TO £10,000
- OVER £10,000
-
GENERAL OVERALL REVIEW/FURTHER ACTIONS REQUIRED
-
BUDGET COST FOR WORKS
- £1,000
- £5,000
- £10,000
- £15,000
- £20,000
- £30,000
- £40,000
- £50,000
- £60,000
- £70,000,£100,000
- £100,000 PLUS
SIGNATURES
-
STORE REPRESENTATIVE
-
CLIENT REPRESENTATIVE
-
CONTRACTOR
-
PMLC LTD