Title Page
-
Engineering Supervisor (ES)
-
Supervisor Name:
-
Conducted on (Date and Time)
-
Location
Pre-Work Checklist
-
Wearing Full PPE? (Photograph of individual in PPE)
-
Specialist PPE required?
-
PTS Card present and in date with TSC, PTS, PO and RRVC competency? (Photograph of card)
-
Have they been briefed and signed the RAMS (Photograph of documents)
-
Are they fit and well and capable of carrying out the works?
-
Briefed and signed any tool box talks?
-
Are they carrying the relevant paperwork to carry out the SSOW?
-
Checked the ES competency card (PTS, PO, TSC and ES) and ensured they are fit to work?
Observations and Questions
-
Has the ES been briefed by the site manager and signed in (photograph of sign in and task briefing sheet)
-
Is the brief suitable, relevant to the worksite and contains all of the information required?
-
Is the ES wearing the appropriate ES armband?
-
Has the ES checked the ES boards are functioning correctly?
-
Has the ES completed the correct paperwork and has all the relevant documents to carry out their duties? ES sheets, PEMS, TSC, WON etc.?
-
Has the ES signed in all relevant personnel to the worksites and recorded this on the ES form?
-
Do they have adequate communication method? Phone etc?
-
Was the ES given permission by the PICOP to set up the worksite?
-
Did the ES test the communication method with the PICOP prior to works commencing?
-
Were the marker boards place out correctly and confirmed with the PICOP?
-
Was the worksite granted by the PICOP and this time recorded?
-
Were all the correct details entered onto the Eng' Sup. Certificate?
-
Did the ES ensure all TSC's were signed in correctly?
-
Did the ES give permission to the TSC's to start work?
-
Did the ES give permission to the RRVC's to on track the RRV's?
-
Did the ES brief the extent of movements by all OTM's?
-
Did the ES ensure all movements were carried out safely and controlled?
-
All activities were carried out solely within the limits of the ES worksite
-
Did the ES take an active interest in the safety on-site?
-
Was the PICOP contacted when work was completed, or suspended?
-
Did the ES have to carry out a handover of duties? If yes, was this carried out correctly with the new ES given a thorough and detailed brief of the works being carried out?
-
Was permission received from the PICOP to remove marker boards?
-
Was the site cleared and checked correctly, ensuring the lines were clear and safe for the passage of trains?
-
Was the PEM form completed and signed off?
-
Was the ES certificate completed and signed off with the appropriate times recorded?
-
Did the ES confirm with the PICOP the marker boards were removed?
-
Did you have to step in or intervene at any point during the works to correct a safety critical aspect?
Completion
-
Reference Guide:
• Look at the total score above and select the relevant overall rating:
Pass: 75%-100%
Further development required: >75% -
Recommendations / Overall Competency Assessment Rating
-
Supervisor (Full Name and Signature)
-
Learner (Full Name and Signature)
Supervisor feedback and notes
-