Title Page
-
Site Name & Job Number:
-
Audit Number:
-
Conducted on
-
Prepared by
-
Location
-
Site Manager
-
Personnel present on site at time of audit:
Previous/Last Audit completed:
-
Have all items to be actioned from the last audit been closed out?
Documentation
-
Requested to sign in?
-
All personnel have received a site specific induction? (Including the auditor?)
-
Work pack suitable for works ongoing?
-
Is the AF2 on displayed when RNCE are PSCS?<br>When not a project specific AF2 is the Generic Framework AF1 & AF2 on site?
-
Health & Safety Plan on site?
-
RAMS available for all relevant tasks?
-
Traffic Management plan present for specific work area.
-
RAMS cover all the work being undertaken and signed off by all personnel on site?
-
Road opening/Road closing licences in place & available?
-
JSSP fully completed and all on site signed on to it?
-
Safepass/CSCS/Relevant training records available for all personnel on site?
-
Regular TBT's completed and copies in crew folder?
-
Where needed, documentation translated?
-
CMP 13 available on site?
-
Forman aware of CMP 13 requirements?
-
Accident/Incident reporting procedure available on site/covered in site induction?
Site Conditions/Housekeeping
-
All ope's guarded?
-
All trip hazards controlled?
-
Clean as you go policy in place?
-
Mushroom caps on protruding rebar?
-
Hand digging being used where required?
-
Toothless bucket being used where required?
-
Area sufficiently lit?
-
Site entrance/perimeter fencing secure/satisfactory?
-
Traffic management erected as per approved plan?
-
Goalposts/Barriers required/in place?
-
Vehicle routes identified?
-
Suitable signs and sufficient in number?
-
Signage provided in language that is accessible/understood by all?
-
Clear/maintained pedestrian routes?
-
Sufficient skips/emptied regularly?
-
Matierals storage area neat and tidy?
Plant/Machienry
-
Evidence of operator training available?
-
Certs available for all plant?
-
Plant in good order? Beacon/Mirrors/Movement alarm inplace?
-
Speed signage in place/required?
-
Trailers on site complying with relevant legislation/requirements?
-
Plant/Pedestrian controls in place and suitable?
-
Seat belts being worn by operatives if needed?
-
Plant being operated in a safe manner?
-
Vehicles safely loaded?
-
Plant secured safely when not in use?
-
Trailing earth lead fitted to plant where required?
-
Height/swing limiter in place?
Lifting
-
Ground conditions suitable?
-
Exclusion zones erected around swing/lifting zone?
-
GA1 (6 monthly) available for all lifting equiptment?
-
GA2 completed for lifting equiptment?
-
SWL clearly displayed on each device?
-
Slings/Chains in good working order?
-
Competent banksman/rigger available where required?
Excavation/Groundworks
-
Permit to dig/JSSP and RAMS in place for works?
-
Services marked prior to excavating commencing? (LUGS person on site?)
-
Adequate edge protection available/in place where required?
-
Sides shaped/sloped/propped?
-
Soil stored safe distance back from edge of excavation? (Min 1m back from edge)
-
Adequate access/egress to excavation?
-
Excavation inspected and recorded on AF3/excavation checklist?
-
Appropriate signage in place warning of excavations?
-
Ladders correctly used/suitable for task? (Correctly secured?)
-
Excavation secured after works?
-
If working in confined spaces are access/egress arrangements adequate?<br>Have operatives the required in date certification?
Emergency Preparedness
-
Emergency numbers available/displayed on site?
-
Certified first aider on site?
-
Appropriate first aid equipment on site suitable for numbers on site?
-
Certified fire extinguishers available on site?
-
Hot works controlled by permit?
-
Flammable Matierals stored safely?
-
Assemble points clearly signed?
-
Monthly emergency drill completed?
PPE
-
Sufficient PPE available on site?
-
Spare PPE available on site?
-
PPE compliance satisfactory? (Chin straps worn by all?)
Tools/Equiptment
-
Tools in safe working order?
-
Inadequate training/information provided?
-
Guards and emergency devices in good working order?
-
Tools protected from unauthorised use?
-
All tools 110v?
-
CAT certified?
-
Compressed air used safely? (Cert and whip checks available and in use?)
-
Tools/Equipment inspected regularly for defects?
-
All tools approved?
-
Electrical tools/leads in good order?
-
Electrical leads stored safely?
Overhead/Underground Services
-
Underground services clearly marked up?
-
LUGS ticket available on site?
-
Overhead lines identified correctly?
-
Warning signage in place?
-
OH/UG services included in RAMS?
-
Are rerouted services/new services marked up on drawings?
-
All works controlled by permit?
Welfare & Site set up?
-
Interface with public has been risk assessed and appropriate control measures are in place?
-
Washing/toilet facilities sufficient for site?
-
Canteen conditions acceptable?
-
Facilities available for making hot drinks/heating food?
-
Hot/Cold water available?
-
Drying room available?
-
Adequate ventilation?
-
Dust control measures in place?
-
Noise control measures in place?
-
Lighting in work area sufficient?
Environmental
-
Waste segregated?
-
Chemicals/fuels stored correctly in bundled area?
-
Spill kit available on site?
-
Personnel aware of environmental requirements?
-
Waste disposed by a licensed contractor?
-
Refuelling being carried out properly on site?
-
Approved containers used for fuel storage?
-
Excavation waste water disposed of correctly?
Cable Pulling
-
Cable ducts installed according to spec?
-
Correct pulling procedure in use?
-
Cable drums loaded/unloaded correctly?
-
Duct covers removed/replaced using proper lifting equiptment?
-
All open ducts/trenches protected?
-
Cable pulling winch adequately maintained?
Work at Height
-
There is an exclusion/controlled entry zone in place?