Traffic Management & Public Safety
-
Physical Traffic Management System set up according to TMP in folder?
-
Traffic management Plan drawing available on site?
-
TMP erected and inspected by SLG operative before works commenced? (Name SLG Op)
-
SLG inspection including all intermittent checks being recorded?
-
SLG operative/HSARW operative on site at all times?
-
Adequate advance warning signs/general signs for motorists, pedestrians, personnel erected?
-
Gardai notified of any positive traffic flow system prior to deployment?
-
Safe routes provided for pedestrians, cyclists, disabled access? (Temp min 1.2m wide).
-
Guarding Barriers erected and maintained securely?
-
Crew vehicles parked safely? (No vehicles in safety zones).
-
Housekeeping /Paths clean and free of trip hazards?
-
Stop &Go being used? Have the operatives involved SLG/HSARW Training?
-
Correct size cones & signage in use for road speed? (60km-600mm)(100km-750mm). (Cones-standard or 1m)
-
Signage in good order?
-
Correct signage spacing a for road speed? (Up to 60km-25m apart using 3 signs) (up to 100km 200m spacings using 3 signs(600m).
-
Clear visibility of signage on approach? (Up to 60km -50m) (Up to 100km - 120m) <br>Meterage given is clear sight line to first sign on approach to works.
-
TM Plan selected noted on JSSP?
-
TM Plan suitable for works?
-
Any changes needed recorded on the TM Amendment sheet? Have changes been notified to TM Designer?
-
Safety Zone in place and are they correct size?<br>(60km- 5m long x 0.5 wide) 100km- 45m long x 1.2m wide).
-
Temp walkways in use? Temp walkways adequate width and adequate signage in place?
-
All operatives in full PPE with helmets. (Long sleeve vests on roads 60km and above)
-
RAMS & JSSP Signed by all on site?