Information
-
Essentra Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel involved in the safety walk
HOUSE KEEPING HAZARDS
-
The site have good 5S (clean, no clutter, no littering, tool/equipment stored orderly, no obstruction on walkway, no standing water )?
-
Corrective Action Required :
-
Corrective action target date
HAZARDOUS ENERGY (LOTO)
-
Are LOCKS-TAGS being used for hazardous energy being use for repair and maintenance work ?
-
Corrective Action Required :
-
Select date
Electrical Safety
-
Electrical panels kept closed and unblocked ?Electrical wiring observed are safe - no exposed wires, dangling wires ? Extension cords not being used in shop floor ?
-
Corrective Action Required
-
Corrective action target date
Machine Guard
-
Machine guards in place and closed ? Missing Guards ? Interlock functional ?
-
Corrective Action Required :-
-
Corrective action target date
WORKING AT HEIGHTS
-
Safe conditions (proper ladder, platform, inspections done ) /practices ( use of permit, use of Harness /fall protection equipment observed ??
-
Corrective Action Required
-
Corrective Action Target Date
HAND SAFETY
-
Are hand tools used in safe conditions ? Correct tools being used ? Tools are stored orderly ? Are PPE used to protect hand injuries ?
-
Corrective Action Required:
-
Corrective action target date
EMPLOYEE PRACTICES (PPE)
-
Are you employees using proper PPE ? Correct PPE being used ? PPE in good conditions ?
-
Corrective Action Required:-
-
Corrective Action Target date
Fire Protection
-
Are fire exits, fire extinguishers, fire alarms, fire hoses clear of any obstruction ? Inspections of fire protection equipment done regulartly
-
Corrective Action Required:-
-
Corrective Action target date
-
Is flammable liquid being stored properly ( e.g. flammable cabinet)
-
Corrective Action Required :-
-
Corrective Action Target date
CHEMICAL USE
-
Are chemical containers being stored properly ? ( proper segregation of hazardous chemicals, secondary containment available , good ventilation, spill kits available, proper chemical labelling)
-
Corrective Action Required:-
-
Corrective Action Target Date