Title Page
-
Category
-
Reviewed by
-
Engineer Name
-
Date
-
Location
-
Charger Type
-
Contract
Arrival on Site & Customer Interaction
-
Did the installer arrive in the allocated time slot?
-
Was the van clean and free of damage?
-
Was the installer presentable with clean uniform and correct PPE?
-
Were you shown any ID?
-
Was the installer polite and professional?
-
Did the installer run through the job description/cable?
Visual Inspections
-
Main fuse/ Tails/ Meter etc satisfactory? (Correct size/ No damage)
-
Is the gas bonding present and within 600mm of gas meter?
-
Is the water bonding present and within 600mm of stop tap?
-
Is bonding required for anything else? (if applicable record in notes e.g. oil)
-
CT in correct location/position?
-
CT correctly terminated and secured? (sticker applied where applicable)
-
Sub main adequate for connection? (RCD/MCB/Cable)
MATTe/GARO Installation (if applicable)
-
Cable entry via manufacturer points only?
-
Earth not exported via chassis to SWA sheath? (intrusive only)
-
Connections adequate with ferrules as appropriate (intrusive only)
Installation of Chargepoint
-
If it's a tethered unit, does the cable reach the vehicle's parked location without putting mechanical strain on the cable?
-
Does the chargepoint location qualify with the OZEV requirements regarding private parking?
-
Is the chargepoint installed within the height limitations of the Code of Practice: Electric Vehicle Charging?
-
Is the location of the chargepoint in the best possible place?
-
Is the chargepoint securely fixed?
-
Are the cable entries into the chargepoint protected from water entry and to the manufacturer spec?
-
Are the crimped ferrules tight and secure? (intrusive only)
-
Are the terminal blocks (60A) separate and securely screwed onto the ferrules? (intrusive only)
-
Are the connections made with ferrules where stranded cables are used?
-
Data cable/CT cable correctly terminated using ferrules where applicable? (intrusive only)
-
Are cables correctly identified/sleeved? (intrusive only)
Cable Installation
-
Is the route of the cable installed to BS7671 and cable size adequate for protective device and suitable for the chargepoint?
-
Is the cable routed in a way to avoid damage/external influences?
-
Is the cable route inside the customers property neat and tidy? (mini trunking, no damage etc...)
-
Has the PVC trunking been installed correctly? (if applicable)
-
Has the PVC trunking been permanently secured to the building/wall? (if applicable)
-
If using PVC T+E / Hi Tuff clipped direct- are the clips evenly spaced and secure along the cable route? (400mm between clips)
-
If using PVC T+E / Hi Tuff clipped direct- Is the entry point via a suitable sized cable gland and tightened to prevent movement? (25mm for 6mm T+E)
-
If using PVC T+E- is the CPC conductor sleeved correctly? (intrusive only)
-
If used (PVC T+E) Is an adaptable box securely fixed and IP rating maintained?
-
Junctions and connections via Red Wago where required? (intrusive only)
-
If using SWA, is the sheathing earthed adequately with banjo and fly lead? (intrusive only)
-
If using SWA, is the sheath insulated at the charger?
-
If using SWA, are the cable cores correctly identified (intrusive only)
Connecting at Consumer Unit
-
Has the EV circuit been clearly identified and labelled appropriately?
-
Have all additional consumer units been correctly labelled?
-
Has the correct rated and type of MCB been installed for the requirements of the chargepoint?
-
Has the chargepoint been protected by the correct type of RCD?
-
Does the make and model of MCB correlate with the existing MCB's in the consumer unit?
-
Are the connections tight and secure? (intrusive only)
-
Are the cable correctly identified? (intrusive only)
-
Rotary isolator installed where required?
-
Connections to sub main via approved methods
Quality of Work
-
Is the work installed to our professional standards, cable route neat and sympathetic to the property?
-
Are the cable terminations neat and equal?
-
Has care been taken during installation?
-
Could anything have been done to improve the quality of the work carried out?
Tests Carried Out
-
Ze
-
IPF
-
R1 + R2
-
Insulation Resistance
-
Polarity
-
Zs
-
RCD
-
Charger connected to WiFi/4G?
-
PC results match that of installers?
Customer Review
-
Was the customer happy with the installation?
-
Did the installer keep you updated throughout the installation?
-
Did the installer explain the use of the unit?
-
Did the installer remove all waste and clean the site before departing?
-
How long was the installer on site for?
-
How would you rate your installation out of 10?
-
How would you rate the process of getting to the installation?
-
How would you rate the product?
-
Any improvements from the installation?
-
Any improvements for the unit/web based app?
-
Would you recommend to others?
Outcome
-
Outcome?
-
QS Signature
-
Customer Signature