Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
-
Has the contractor design work been reviewed by a licensed engineer?
-
Please provide details of any deviations from the project specifications found in the contractor's design work.
-
How many design iterations did the contractor go through before finalizing the design?
-
True or False: The design work includes all necessary safety features as per regulations.
-
When was the last update made to the design document?
-
Please upload a sample section of the contractor's design work for visual inspection.