Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Project Name:
-
Date & Time:
-
Completed by:
-
Signed:
DOCUMENTATION:
-
Has a Permit to Dig been issued to contractor by site team?
-
Are services drawings available?
-
Are copies of plant operators valid CPCS / NPORS card (UK) or CSCS (RoI) maintained with induction records?
-
Does the groundworker supervisor hold training valid H&S training e.g. SSSTS?
-
Is a calibrated CAT and genny in use with cert on file?
-
Is evidence of users CAT-scanning training on file?
-
In RoI a CSCS Location of Underground Services (LUGS) card is mandatory
-
Is the RA/MS suitable for groundworks being completed and specific to the task?
-
Have all operatives been briefed on the RA/MS and signed-off?
ON – SITE:
-
Is hand-digging being completed anywhere within 500mm of known services?
-
Is there a spotter in place working with excavator?
-
Are insulated hand tools in use?
-
Have underground services been identified through trial holes to verify their location, depth and identity?
-
Is suitable edge protection in place to excavations?
-
Are all operatives on site aware of safety precautions stipulated on Permit to Dig?
-
Are others excluded from movements of groundworkers mobile plant, e.g. barriers in place to ensure others remain outside the operating radius of the excavator arm and bucket?